ELENA Integration. Status of integration. Position of the machine is defined Layout of the machine well defined Position of elements and envelopes known in general Layout naming convention approved (EDMS 1228775 ) Layout drawings version 1 available on CDD A number of known issues:
E N D
ELENA Integration F. Butin / ELENA collaboration
Status of integration • Position of the machine is defined • Layout of the machine well defined • Position of elements and envelopes known in general • Layout naming convention approved (EDMS 1228775) • Layout drawings version 1 available on CDD • A number of known issues: • BPM geometry not yet compatible with magnetic elements • Integration of some vacuum flanges problematic, bellows not yet implemented • A (small) number of geometric interferences F. Butin / ELENA collaboration
ELENA Machine Position The position of the machine is now defined in a released version 1, available on EDMS Nextstepis to go through a formalapproval Then, new versions canonlyberequested via ECR procedure F. Butin / ELENA collaboration
General layout F. Butin / ELENA collaboration The generallayout of the machine isdefined in drawing ADLM___0070 released and available on EDMS The new iterationswillbeclearlyidentified by their release version number
Possible waysforward… • In order to solveintegration issues, wecan: • ReconsiderQuadrupolesenvelope (340 mm) • Reconsider Scraper / RF / SchottkiPU/ e-coolerenvelopes • Reconsidernecessity and position of bellows/flanges/valves • Re-design of BPM feedthroughs (on-going) to be compatible with quads and solenoids • Possiblyintegratecoorectors in dipoles… F. Butin / ELENA collaboration
RP studies Various simulations have been runsoestimate the dose in normal operation and in accidentallosses scenarios Someparameters must berefined in order to provide more realistic and reliable values A parameterlistwillbeproduced (action Pavel) and handed to RP in this objective F. Butin / ELENA collaboration
RP studies 3 2b 2a 1 closed F. Butin / ELENA collaboration Courtesy R. Froeschl
RP studies Examples of Results of simulations Courtesy R. Froeschl F. Butin / ELENA collaboration
Integration of GBar EA F. Butin / ELENA collaboration
Integration of GBar EA F. Butin / ELENA collaboration
New annex building (393) Preparing the CfT of fabrication: docs are beingapproved on EDMS Integration meeting planned on 23rd Nov to betterdefine distribution of services Access road redefined Workexpected to start May-June 2013 F. Butin / ELENA collaboration
Internal distribution Circulation gangway F. Butin / ELENA collaboration
Porte 2,5x 3m2 EL Kickers 12.7 x 14.7 m2 CV 6x1,5 m2 Gbar Storage (6 x 3 m2) ASACUSA Storage (6 x 3 m2) ALPHA Storage (6 x 3 m2) AEGIS Storage (6 x 3 m2) Offloading area (8x4.6 m2) Magnetichorns test bench(10 x 7 m2) ATRAP Storage (6 x 3 m2) Sink Test bench7 x 10 m2 Workshop (5 x 10 m2) BASE Storage (6 x 3 m2) Porte 6x 6 m2 F. Butin / ELENA collaboration
Porte 2,5x 3m2 EL Kickers 12.7 x 14.7 m2 Test bench7 x 10 m2 CV 6x1,5 m2 Not in the budget… m2 MezzanineStorage 10 x 12 Storage (6 x 3 m2) Storage (6 x 3 m2) Storage (6 x 3 m2) Porte 6x 6 m2 F. Butin / ELENA collaboration
Transfer linesintegration O. Choisnet S. Maridor For drawings F. Butin / ELENA collaboration Transfer linestowardsexistingexperiments Design in progress (W. Bartman) Transfer line to Gbarisquitewelladvanced Integration of elementswillfollow