1 / 4

Elena Project

Elena Project. Planning H- source Evolution N. GILBERT. March 2012. End LS1. Bldg 393. Kicker pltf. H- ??. Evolution of the situation. LS1 prolonged by 2 months Annexed building start was delayed Consequently kicker platform postponed

muniya
Download Presentation

Elena Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Elena Project Planning H- source Evolution N. GILBERT

  2. March 2012 End LS1 Bldg 393 Kicker pltf H- ??

  3. Evolution of the situation • LS1 prolonged by 2 months • Annexed building startwasdelayed • Consequently kicker platformpostponed • Planning magnettoo short (prototype phase necessary) •  H- : 2014 period (1/3 – 30/11) moved to 2015

  4. July 2012 End LS1 Bldg 393 Kicker pltf H-

More Related