1 / 14

E07-006: SRC in 4 He

E07-006: SRC in 4 He. June 2010 Navaphon (Tai) Muangma Massachusetts Institute of Technology Thomas Jefferson Laboratory. Topics. SRC Physics 12 C SRC vs. 4 He SRC experiment Current Status. SRC Physics. Customized ( e,e’pN ) Measurement.

Download Presentation

E07-006: SRC in 4 He

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E07-006: SRC in 4He June 2010 Navaphon (Tai) Muangma Massachusetts Institute of Technology Thomas Jefferson Laboratory

  2. Topics • SRC Physics • 12C SRC vs. 4He SRC experiment • Current Status

  3. SRC Physics Customized (e,e’pN) Measurement To study nucleon pairs at close proximity and their contributions to the large momentum tail of nucleons in nuclei. A pair with “large” relative momentum between the nucleons and small center of mass momentum • high Q2 to minimize MEC • x>1 to suppress isobar contributions • Anti-parallel kinematics to suppress FSI

  4. SRC Physics From the (e,e’), (e,e’p), and (e,e’pN) Results • 80 +/- 5% single particles moving in an average potential • 60 – 70% independent single particle in a shell model potential • 10 – 20% shell model long range correlations • 20 +/- 5% two-nucleon short-range correlations • 18% np pairs • 1% np pairs • 1% nn pairs (from isospin symmetry) • Less than 1% multi-nucleon correlations R. Subedi et al., Science 320, 1476 (2008), published online 29 May 2008 (0.1126/science.1156675).

  5. SRC Physics 4He prediction pp/pn pairs

  6. SRC Physics

  7. SRC Experiments

  8. Current Status General • Software/Analysis • Interactive GUI prepared, Online Analysis is ongoing. • Run Plan • Calibration planned, production plan not yet finalize. • Installation • December 2010 [tentative]. • Experiment Running • February 2011 [tentative].

  9. Current Status BigBite & Neutron Detector

  10. Current Status BigBite Testing with Cosmic Ray [Testlab : Jan-May 2010] • Efficiency testing for MWDC • 98-99% individual plane with HV -1700 V • Noise reduction • Cable and LT replacement, grounding issue. • Electronic • Power supply change, Roc 5 modification, Roc 9 replacement • A/D cards and LT are now with A’ group • Future • More tests when get A/D cards and LT back in July

  11. Current Status HAND New Frame Design and Build [Testlab : Jan-May 2010] • New Frame • Designed– Ordered – Received • New two layers • Scintillator bars tested, ready to build. • Future • Testing with Cosmic ray [Summer 2010]

  12. Current Status HAND Previous Version Upgraded Version

  13. Current Status HRS & Target • Standard HRS package • Left HRS: electron package [electron] • Right HRS: S1, S2 and VDC [proton] • 4He, LD2 , LH2 • Standard Cryogenic targets • 12C foils , Al Dummy

  14. Man Power • Postdoc • Ran Shneor (Tel Aviv) • Vincent Sulkosky (MIT) • Aidan Kelleher (MIT) • Graduate Students: • Or Chen (Tel Aviv) • Igor Korover (Tel Aviv) • Larry Selvy (Kent State) • Navaphon (Tai) Muangma (MIT)

More Related