1 / 8

Team Unum

Team Unum. PDR #2 – 9/9/04 Design Requirements. Design Factors. Target market / customers Our capabilities Time and cost. Pressure Range. Requirement: Input 0-100psi, Output 0-65psi. Reasoning: Air pressure requirements of all possible applications Pressure losses

latona
Download Presentation

Team Unum

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team Unum PDR #2 – 9/9/04 Design Requirements AME 470 – Team Unum

  2. Design Factors • Target market / customers • Our capabilities • Time and cost AME 470 – Team Unum

  3. Pressure Range • Requirement: Input 0-100psi, Output 0-65psi. • Reasoning: • Air pressure requirements of all possible applications • Pressure losses • Similar valves in the market AME 470 – Team Unum

  4. Standard Connections • Requirement: compatible with 3/8” and 1/4” threaded fasteners • Reasoning: • Standard thread sizes • Compatible with existing compressors and pumps AME 470 – Team Unum

  5. Physical Dimensions • Requirements: • Target weight: less than 5 pounds • Target Volume: 7” X 4” X 2” • Reasoning: • Needs to be handheld and portable AME 470 – Team Unum

  6. Electrical Components • Requirements: • Battery operated • Microprocessor PIC877 or similar • LCD • Pressure Transducer • 12-button keypad AME 470 – Team Unum

  7. Other Considerations • Waterproof • Safe to drop from 5 feet • User friendly and safe • Robust yet sleek AME 470 – Team Unum

  8. Upcoming Activities • Finalize Individual Design Concepts • Hand in on Thurs, Sept. 9th • Team Design Proposal • Completed by Tues, Sept. 14th AME 470 – Team Unum

More Related