CMSD Revised Master Plan Proposal “From Vision to Victory” Community Forums May 2008. PRE ISSUE 14 (MAY 2001). 2001 CMSD student enrollment was 77,000 students There was a drastic need to fix crumbling buildings….Plain Dealer January 23, 2001. OSFC Accelerated Urban Program was not in effect
E N D
CMSD Revised Master PlanProposal“From Vision to Victory”Community ForumsMay 2008
PRE ISSUE 14 (MAY 2001) • 2001 CMSD student enrollment was 77,000 students • There was a drastic need to fix crumbling buildings….Plain Dealer January 23, 2001. • OSFC Accelerated Urban Program was not in effect • Issue 14 raised $335 million to repair most drastic conditions (failed boilers, failed roofs and windows, repair out of service plumbing and electrical equipment. • Charter School Enrollment was 2,887 students
2001-2006 • OSFC building condition assessments were completed January 2002 • CMSD/OSFC Master Plan was agreed to May 2002 • OSFC’s Master Plan enrollment projection was 72,500 for 2005/2006 • County-wide/urban enrollment decline • Inflation factors have increased the cost of building schools
KEY POINTS • All funding is tied to enrollment count • Maximize the number of PreK-8 neighborhood schools • Plan for PreK academic space • Provide 20:1 student/teacher ratio for grades K-3 • Create future flexibility by maintaining at least 1 large elementary school in each academic area • Maintain all comprehensive high schools • Schools not receiving OSFC dollars will be maintained by the District
OSFC Enrollment Projections 2015 • Sp. Ed. PreK-5 23,505 • 6-8 Grades 8,335* • 9-12 Grades 8,197* • Vocational Ed 706 Total 40,743 *Appeal to OSFC 6-8 11,391 *Appeal to OFSC 9-12 15,188
Segments 1-4 Allocated Space • Sp. Ed. PreK – 5 9, 962 • 6-8 Grades 4,808 • 9-12 Grades 3,917 • Vocational Education 55 • Total 18,742
OSFC Enrollment Projections2015-2016 PreK 726 (funded)
Concerns (H.S.) • Inconsistency between District plans and OSFC enrollment projections (+750) • CMSD’s contribution to project -$23.5 million • Lack of funding plan (Needed: large bond issue and additional revenue) • West Side Relief HS – Within months of having early site package bid • CSA planned as a renovation
Concerns K-8 • Maximizes number of schools – building smaller 350 student schools • Maximizes number of neighborhood schools • Disadvantage: increased cost per square foot associated with smaller schools