130 likes | 147 Views
Design Review Three. Micro Air Vehicle Project: P07121 03.23.07 Sponsored by Impact Technologies The Boeing Company. Jeffrey Kozak Customer / Guide Mechanical Engineering. Geoff Amey Computer Engineering. Benjamin Metz Mechanical Engineering. Timothy Nowicki Mechanical Engineering.
E N D
Design Review Three Micro Air Vehicle Project: P07121 03.23.07 Sponsored by Impact Technologies The Boeing Company Jeffrey Kozak Customer / Guide Mechanical Engineering Geoff Amey Computer Engineering Benjamin Metz Mechanical Engineering Timothy Nowicki Mechanical Engineering David Blonski Industrial Engineering Team Leader Mark Baybutt Electrical Engineering Patrick O’Neil Mechanical Engineering Daniel Segar Mechanical Engineering Andrea Wyant Electrical Engineering Perry Young Mechanical Engineering
P0121: Introduction • Introduction: • Assumed that all major design concepts have been set • Final design will be tweaked based on testing • Focus of future effort will be spent on testing and fabrication • Team will adhere to following schedule to complete project on time • Team will follow a flight test plan to ensure results are accurate
P0121: Design Update • Rule Change: • Fly 600m • Capture one (1) image • Design Change: • 7.4V, 480mAh battery • ~10g lighter • Additional testing needed to determine if battery can support high propeller velocity • 7.4V, 780mAh battery may still be used for endurance portion of competition
P0121: Schedule • Week 2: • Successful implementation of new propulsion system • Build another pod with new propulsion system • 1st draft of g-pod • Complete lift device • Complete CAD design of wing (send to rapid prototyper) • Vacuum bag seminar • Confirm range of transmitter • Order motors 0 1 3 4 5 6 7 8 9 10 Competition SDII Starts
P0121: Schedule • Week 3: • Practice testing with trainer outside • Continue testing MAV with new propulsion system • Set location of g-pod • Set dimension of g-pod • Load components in g-pod • Develop removal method for g-pod • New Tail • New wing at prototyper • Set weight (battery) Completed prototype of undercarriage 0 1 2 4 5 6 7 8 9 10 Competition SDII Starts
P0121: Schedule • Week 4: • Test pod design • Confirm launch method • Continue testing trainer with camera • Refine budget/inventory 0 1 2 3 5 6 7 8 9 10 Competition SDII Starts
P0121: Schedule • Week 5: • Continue testing MAV with pod • Build MAV with new wing • Continue testing trainer with camera • Start technical paper 0 1 2 3 4 6 7 8 9 10 Competition SDII Starts
P0121: Schedule • Week 6: • Test MAV with new wing • Build MAV with new angle of attack • Begin testing MAV with camera • Complete website 0 1 2 3 4 5 7 8 9 10 Competition SDII Starts
P0121: Schedule • Week 7: • Test MAV with new angle of attack • Make final parts order 0 1 2 3 4 5 8 9 10 6 Competition SDII Starts
P0121: Schedule • Weeks 8-10: • Test and refine! • Elevons • Center of Gravity • Counter-torque 0 1 2 3 4 5 7 6 9 10 Competition SDII Starts
P0121: Test Plan • Stage 1:
P0121: Test Plan • Stage 2:
P0121: Successful Flight • Definition: • Sustained flight for 1.5 minutes (18mph x 1.25min = 600m) • Complete 360o turns in both CW and CCW directions 3. Controlled climb and dive with successful stabilization 0 1 2 3 4 5 7 6 8 9 Competition SDII Starts