SPS Syncrotron Telescope Software specifications Aurélie Goldblatt BE-BI-PM 20.03.2014

SPS Syncrotron Telescope Software specifications Aurélie Goldblatt BE-BI-PM 20.03.2014. SPS properties. Period: 23 us Timing supercycle : 0.8 Hz 25ns bunch spacing => 40MHz Number of 25ns buckets: 924

lave
Download Presentation

SPS Syncrotron Telescope Software specifications Aurélie Goldblatt BE-BI-PM 20.03.2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPS SyncrotronTelescope Software specifications Aurélie GoldblattBE-BI-PM 20.03.2014

  2. SPS properties • Period: 23 us • Timing supercycle: 0.8 Hz • 25ns bunch spacing => 40MHz • Number of 25ns buckets: 924 • Max number of proton bunches: 4x72 =288 (intensity limitation, only for LHC injection?). 225 ns spacing between batches • Flat top = 1.2s (to be confirmed) • Fix target beam has more bunches with less intensity per bunch (and goes only to 400GeV) ?

  3. Camera Analog intensified and gated camera Proxitronic (LHC BSRT camera) Acquisition rate = 50Hz but through MTV= 3-4 Hz Expected acquisition: 4-5 bunches per fillin bunch mode (if only measurable at flat top) • Camera Acquisition (MTV) • Camera ON/OFF (TTL VMOD)

  4. Gate Control: (DAB, BOBR, TTL VMOD) Two modes: - Bunch Scan: 25ns gate synchronous with timing machine - DC : gate opened Bunch Scan mode: gate synchronized with selected bucket (12.5 ns delay steps, DAB card synchronised with the BST (BOBR) • Bunch selection from a list of filled buckets (FBCT) • Number of acquisitions per bunch • Scan ON,OFF, standby, freeze: • Scan ON: acquire the number of frames selected then go to the next bunch selected. Average on the fit. • Scan OFF: acquisition on selected bunch? (Sliding average on the fit or no average?) • Scan Standby • Scan Freeze

  5. Gain and Position Gain Control:(DAC VMOD , MIDI) • Manual: set the gain and filters manually • Automatic: No feedback. Gain, filters = f(FBCT) or table. Need to calibrate with beam (flat top and ramp?)Need to check intensifier time response. Position Control: (MIDI) • Manual: set the steeringmotors • Automatic: Feedback on the position. Need to copewithbeampresence but not seen by camera (lowenergy).

  6. Motors Control (MIDI) BSR • Steering mirror H • Steering mirror V • Filter wheel (no PC => no pneumatic) • Camera translation stage If LDM: • 2 filter wheels • TS X • TS Y • In/out beam splitter

  7. Display Image from camera: • Area selection (for display and fit) • Cross cut selection • BW/WB/Color • Save/clear/subtract ref image • Accumulate Traces from area selection (default: whole image) • H&V profiles (amplitude vs position) • Measurement • Fit • H&V position vs time • H&V amplitude vs time • H&V sigma vs time Traces from cross cut selection- H&V profile from cross cut

  8. Display On all traces: • Zoom • Pan auto • Marker • Cursors • Grid • Save Readout: • Sigma * • Amplitude • Position *Corrected H&V sigma: where M from calibration and c from wire scanners (?) Remark: no emittance extrapolation, only sigma data for beginning.