Vadodara WRTS-II : A New Success Story To AGRA GWALIOR As on 01.06.2007 To KANKROLI (Under NR I) SATNA ZERDA (KANSARI) TO SINGRAULI DAMOH BINA VINDHYACHAL 2 x 250 MW NAGDA RANCHORPURA (VADAVI) DEHGAM BINA JABALPUR BHOPAL M A D H Y A P R A D E S H BIRSINGPUR G U J A R A T MUNDRA UMPP INDORE KARAMSAD ITARSI ASOJ RAJGARH 1x315 MVA TRFR KORBA (E) KORBA(W) SEONI SIPAT LIMDI (CHORNIA) 25% SERIES COMPN. SATPURA KHANDWA KORBA (NTPC) JHANOR 40% Series Compn S’ SAROVAR 10 x 500 MVA TRFR Quad Codr. GTEC JETPUR HALDARWA KAKARAPAR KORADI ITCHAPUR BHILAI VAV WARDHA KAWAS NAVSARI DIU VAPI L E G E N D SIPAT – I TRANSMISSION SYSTEM SIPAT – II TRANSMISSION SYSTEM VINDHYACHAL – III TRANSMISSION SYSTEM SIPAT – II SUPPLEMETARY TRANSMISSION SYSTEM SYSTEM STRENGTHENING SCHEME - I SYSTEM STRENGTHENING SCHEME – II BARH TRANSMISSION SYSTEM VINDHYACHAL – KORBA TR. SYSTEM BINA – NAGDA TR. SYSTEM INTER REGIONAL SCHEMES (EW & NW CORRIDORS) SYSTEM STRENGTHENING SCHEME - III SYSTEM STRENGTHENING SCHEME – IV VAPI DHULE DNH KHARADPADA MAGARWADA DAMAN 400/220 KV POWERGRID LINES EXISTING / UNDER CONSTRUCTION POWERGRID SUB STATION EXISTING HVDC BACK TO BACK (POWERGRID) 765kV LINES UNDER NEW PROJECTS (with Project wise colour coding) 400kV LINES UNDER NEW PROJECTS (with Project wise colour coding) SEB’s / OTHER’s SUB STATIONS TARAPUR BOISAR PADGHE TRANSMISSION SYSTEMS UNDER POWERGRID WESTERN REGION - II
A New Star on the Horizon An overview of Western Region Transmission System - II • Transmission Network: • 10968 ckt. km • 5355 MVA • 10 Substations • Transmission Network availability: Above 99 .33% • WR – II, RHQ Started functioning w.e.f. 1st June 2007 • WR – II covers the states of Madhya Pradesh, Gujarat, DD & DNH WRTS - II : An Overview
Assets in WRTS – II : Commissioned WRTS - II : An Overview
Transmission Lines Commissioned During 2007 - 08 • North – West first 400 kV inter connector Gwalior – Agra line was put into commercial operation w.e.f 01.04.2007 • 765 kV S/C Bina - Gwalior Transmission Line was put into commercial operation w.e.f 01.04.2007 • Sipat – Seoni Transmission line along with associated bays first of its kind in the country at 765 kV level was put into commercial operation w.e.f 01.10.2007 • 400 kV D/C Bina – Nagda Transmission line was put into commercial operation w.e.f 01.09.2007, 4 months ahead of schedule. • 400 kV D/C Satna – Bina Transmission Line was put into commercial operation w.e.f 01.09.2007 Project Implementation
Transmission Lines Commissioned During 2007 - 08 • 1200 kV Testing station inaugurated at Bina S/S on 29.12.2007. • 400 kV Nagda – Dehgam Ckt. I & II was put into commercial operation w.e.f 01.02.2008 and 01.01.2008 respectively. • 400 kV Khandwa – Rajgarh Transmission Line was put in to commercial operation w.e.f 01.04.2008 • 400 kV D/C Seoni – Khandwa Transmission Line was put in to commercial operation w.e.f 01.04.2008 • LILO of 400 kV Sardar Sarovar – Nagda Transmission line was put in to commercial operation w.e.f 01.04.2008 Project Implementation
Substations Commissioned during 2007-08 Project Implementation
Transmission Lines & substation Commissioned During 2008 - 09 • 220 kV D/C Vapi – Magarwada & Vapi – Kharadpada Transmission line was put into commercial operation w.e.f 01.05.2008 and 01.07.08 respectively. • 765 kV S/C Gwalior – Agra Ckt – II Transmission Line was put into commercial operation w.e.f 01.04.2009 • 765 kV S/C Seoni – Wardha Ckt – I Transmission Line was put into commercial operation w.e.f 01.04.2009 • 400 / 220 kV Substation at Damoh was put into commercial operation, with w.e.f 01.09.2009. Project Implementation
Ongoing Projects (Continued) Project Implementation
Ongoing Projects (Continued) Project Implementation
New Projects A Bright Future Ahead …
New Projects – Works commenced • WRSS – V (WR – II Portion) • 400 kV D/C Vapi – Navi Mumbai • 220 kV D/C Vapi – Khadoli line • Bay Extn. at Vapi & Khadoli Substations. • WRSS – VI • 400 kV D/C Pirana (Kamod) – Dehgam line • 400 / 220 kV (2 x 315 MVA) Substation at Pirana (Kamod) • Bay Extn. at Bina (315 MVA ICT), Gwalior (315 MVA ICT) & Dehgam Substations. Project Implementation
New Projects • WRSS – VII • 420 kV, 125 MVAR Bus reactor at Khandwa & Dehgam Substations. • WRSS – IX • LILO of 400 kV D/C Bina – Nagda at Sujalpur. • 400 / 220 kV (2 x 315 MVA) Substation at Sujalpur. Project Implementation
UMPP Transmission System • SASAN UMPP Transmission System : • 765 kV S/C Sasan – Satna line I & II • 765 kV S/C Satna – Bina line I & II • 400 kV D/C Bina (MPPTCL) – Bina (POWERGRID) • LILO of 400 kV D/C Vindhyachal – Jabalpur at Sasan • Up gradation of existing 400/ 220 kV Substations at Gwalior, Satna & Bina to 765 kV level. • New 765 / 400 kV Substation at Indore (POWERGRID). • 765 kV S/C Bina – Indore (New), initially to be charged at 400 kV level. • 400 kV Quad D/C Indore (POWERGRID) – Indore (MPPTCL) line. Project Implementation
UMPP Transmission System • MUNDRA UMPP Transmission System : • 400 kV D/C Mundra – Limdi (Triple Snowbird) • 400 kV D/C Mundra – Bachau – Ranchhodpura (Triple Snowbird) • 400 kV D/C Mundra – Jetpur (Triple Snowbird) • 400 kV D/C Gandhar – Navsari • 400 kV D/C Navsari – Navi Mumbai • LILO of both Ckts of 220 kV D/C Kawas – Navsari at 400 kV Navsari (PG) Substation • 400 / 220 kV (2 x 315 MVA) Bachau Substation (AIS) • 400 / 220 kV (2 x 315 MVA) Navsari Substation (GIS) Project Implementation
Consultancy Works • Construction of 220 / 66 kV Khadoli S/S for DNH. • Engineering & Contracts consultancy to TPL for 400 kV D/C SUGEN (Torrent) – Pirana (POWERGRID) Transmission line. • 400 kV D/C Vindhyachal – Satna Ckt. I & II and Ckt. III & IV line diversion for MP Sainik Coal mines at Vindhyachal end (M.P.) Project Implementation
Presence of POWERGRID in GUJARAT • POWERGRID, the Central Transmission Utility of the country, has been entrusted with the establishment of inter-State and inter-regional transmission system in the country to facilitate transfer of power within and across the regions from various central sector generation projects. • Gujarat is one of the beneficiaries of the inter-State transmission systems of POWERGRID in Western Region which facilitates / will facilitate transfer of power from central sector generation projects in the region as well as import / export of power from other Regions / States through open access Project Implementation
Presence of POWERGRID in GUJARAT • Presently, POWERGRID owns and operates about 3200 circuit km of transmission lines, 2 nos. of 400/220kV substations with 1260 MVA transformation capacity in Gujarat. Further, about 3300 circuit km of transmission lines, 3 nos. of 400/220 kV substations with 1890 MVA transformation capacity are under implementation in Gujarat. • Further, under RGGVY, POWERGRID had entered into a quadripartite agreement with Rural Electrification Corporation (REC), State Government and State Power utility, for undertaking rural electrification works in the country. POWERGRID was assigned the job for execution of rural electrification works in two districts namely, Bharuch and Narmada in Gujarat Project Implementation
Transmission Lines under Operation in Gujarat • 400 kV Transmission Lines in Gujarat: • Gandhar – Dehgam Ckt I - 157 Kms • Gandhar – Dehgam Ckt II - 157 Kms • Gandhar - GTEC - 13 Kms • Gandhar - Sugen - 57 Kms • Sugen - Vapi - 110 Kms Project Implementation
Transmission Lines under Operation in Gujarat • 220 kV Transmission Lines in Gujarat: • Kawas - Navsari-I - 49 Kms • Kawas - Navsari-II - 49 Kms • Kawas - Haldarwa-I (Bharuch) - 81 Kms • Kawas - Haldarwa-II (Bharuch) - 81 Kms • Kawas - Vav (Valthan) - 37 Kms • Kawas – Ichchapur - 3 Kms • Ichchapur - Vav (Valthan) - 34 Kms • Kakrapar - Vav-I (Valthan) - 43 Kms • Kakrapar - Vav-II (Valthan) - 43 Kms • Kakrapar - Vapi-I -117 Kms • Kakrapar - Vapi-II -117 Kms Project Implementation
Transmission Lines under Operation in Gujarat • 220 kV Transmission Lines in Gujarat: • Kakrapar - Haldarwa-I (Bharuch) - 74 Kms • Kakrapar - Haldarwa-II (Bharuch) - 74 Kms • Gandhar - Haldarwa-I (Bharuch) - 13 Kms • Gandhar - Haldarwa-II (Bharuch) - 13 Kms • Vapi - Magarwada-I - 26 Kms • Vapi - Magarwada-II - 26 Kms • Vapi - Karadpada-I - 30 Kms • Vapi - Karadpada-II - 30 Kms • Substations under Operation in Gujarat • 400 / 220 kV Substation at Vapi – 630 MVA • 400 / 220 kV Substation at Dehgam – 630 MVA Project Implementation
Transmission Lines in Gujarat connected with other States • 400 kV Transmission Lines : • Zerda – Kankroli - I - 234 Kms • Zerda – Kankroli - II - 234 Kms • Vapi - Boisar - 91 Kms • Dehgam - Nagda-I - 331 Kms • Dehgam - Nagda-II - 331 Kms • Asoj - Indore - Ckt-I - 289 Kms • Asoj - Indore - Ckt-II - 273 Kms Project Implementation
Transmission Lines under Construction in Gujarat • Western Region Strengthening Scheme - V: • 400KV D/C Vapi (PG) - Navi Mumbai - 370 Kms - Sep'10 • 220KV D/C Vapi - Khadoli (UT of DNH) - 56 Kms - Sep'10 • Western Region Strengthening Scheme - VI • 400KV D/C Dehgam - Pirana line - 106 Kms - Nov'10 Project Implementation
Transmission Lines under Construction in Gujarat • Transmission Lines Associated with Mundra UMPP. • 400KV D/C Mundra – Limbdi (Triple snowbird) - 602 Kms - Oct'12 • 400KV D/C Mundra - Bachchau – Ranchodpura (Triple snowbird) - 776 Kms - Oct'12 • 400KV D/C Mundra - Jetpur line (Triple snowbird) - 656 Kms - Oct'12 • 400KV D/C Gandhar - Navsari line - 268 Kms - Oct'12 • 400KV D/C Navsari - Mumbai line - 408 Kms - Oct'12 • LILO of both Ckt of Kawas - Navsari 200KV D/C at Navsari - 100 Kms - Oct'12
Substations under Construction in Gujarat • Western Region Strengthening Scheme – VI • 400/220KV Pirana Sub station - (2x315) 630 MVA - Nov'10 • Transmission System Associated with Mundra Ultra Mega Power Project. • 400/220KV Bachchau Sub station - (2x315) 630 MVA - Oct'12 • 400/220KV Navsari (GIS) Sub station- (2x315) 630 MVA - Oct'12
Brief on Implementation of RGGVY Works in Gujarat by POWERGRID POWERGRID has been entrusted with implementation of RGGVY Works in Two (2) Districts of Gujarat during 10th Plan. Summary of projects sanctioned are as follows: Projects sanctioned: District Sanctioned Cost Bharuch Rs. 18.24 Core Narmada Rs. 13.92 Core Status of Implementation : Bharuch Villages Completed 656 (All P/E) BPL Connections given 25569 Narmada Total Quantity Completed Villages 552 (All P/E) 259 BPL Connections 37309 29018 Anticipated Completion Sept ‘09
Social Assessment & Management Plan (SAMP) ESPP Activities
Social Assessment & Management Plan (SAMP) ESPP Activities
Highlights • Cumulative system availability was 99.33% during the previous financial year 2008 - 09. • System availability is above 99.3% till date during the current financial year 2009 - 10. Operation & Maintenance
Status Vis-à-visMOU target Operation & Maintenance
POWERGRID EMPOWERING THE NATION Thank You