250 likes | 370 Views
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering Fall, 2015. Master data plays an important role in APO and control many processes.
E N D
Master Data for SCM (1)Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics EngineeringFall, 2015
Master data plays an important role in APO and control many processes. • Some master data objects in APO have analogies in ERP like product (Material in ERP), and most of these are transferred from ERP. Others have to be maintained in APO. • Most organisational entities from ERP are not needed for APO, which is only concerned with logistics and not accounting and costing; so organizational entities such as company codes, or cost centers have no significance in APO. Master Data Overview
BW: business data warehouse DP Function in SCM OLTP: online transaction processing OLAP: online analytical processing HANA: High-Performance Analytic Appliance
SNP: Supply Network Planning ATP: Available-to-promise TP: Transportation Planning VS: Vehicle scheduling PP: Production Planning DS: Detailed scheduling Level of Detail and Time Horizon of DP in APO Modules
CIF: Core interface DP Module in APO System Structure and Integration with ERP LIS: Logistics Information System
Master Data for Demand Planning: • - Product • CVC (characteristic value combinations) • Master data for Sales: • - Location, • Product, • Rules Overview Master Data and Application in DP and Sales
The most primitive questions in DP are: • on which levels (product, product group, …) to plan? • in which periods of time (weeks, months) to plan? • which data is required? • In APO, planning levels are represented by characteristics (CVC), the period of timer corresponds to the time (i.e., time bucket), and the data (linked to “key figures” such as revenue and sold quantity). Planning Levels and Consistent Planning
Process for Demand Planning Result of the demand planning process: independent requirements which will trigger the planning activities ofdistribution, production and procurement planning.
Planning shall take place on the levels of sales organization, location, product and product group. Each product belongs to only one product group Key figures include sales forecast and demand plan. Planning Levels and Consistent Planning
Location Active Characteristic Value Combinations (CVC) The CVCs are 24 (3 sales organizations x 2 locations x 2 product x 2 product groups), in theory and 16 CVCs are active.
5 10 CVC for the Use of DP-BOMs
5 150 50 100 10 100 300 200 CVC for the Use of DP-BOMs
Sales order entry is performed in ERP either manually or via EDI (EDI - Electronic Data Interchange), but ATP check is carried out in APO during the sales order entry. Transportation planning is performed in APO based on the deliveries and sends shipments back to ERP. Order Fulfillment Overview
Exercises: (Due date 12/5/2015) 1. SCM resource setting 2. Change work centers 3. Create purchasing information records 4. Display info records by vendor 5. Create demand in SAP ERP - Change planning strategy - Create demand for the finished products