1 / 29

Engineering Solutions Event

Engineering Solutions Event. Six students will design a solution to an engineering problem. Students will work as a team to design solutions. Teams will be receive a set of construction materials and pricing charts. There are potentially multiple solutions to the problem.

leane
Download Presentation

Engineering Solutions Event

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering Solutions Event • Six students will design a solution to an engineering problem. • Students will work as a team to design solutions. • Teams will be receive a set of construction materials and pricing charts. • There are potentially multiple solutions to the problem.

  2. University City is currently home to a number of new construction projects.

  3. University City is currently home to a number of new construction projects.

  4. University City is currently home to a number of new construction projects.

  5. University City is currently home to a number of new construction projects.

  6. University City is currently home to a number of new construction projects.

  7. University City is currently home to a number of new construction projects.

  8. University City is currently home to a number of new construction projects.

  9. University City is currently home to a number of new construction projects.

  10. University City is currently home to a number of new construction projects.

  11. University City is currently home to a number of new construction projects.

  12. University City is currently home to a number of new construction projects.

  13. University City is currently home to a number of new construction projects.

  14. University City is currently home to a number of new construction projects.

  15. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit.

  16. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. Each cube represents a hotel room. All 50 cubes must be used.

  17. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. Entire hotel must be connected as one piece.

  18. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. Entire hotel must be connected as one piece.

  19. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. Entire hotel must be connected as one piece.

  20. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. All rooms must have at least one window. (A window is any exposed vertical side of cube.)

  21. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. All rooms must have at least one window. (A window is any exposed vertical side of cube.)

  22. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. All rooms must have at least one window. (A window is any exposed vertical side of cube.)

  23. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. COSTS Land costs $400 per square unit. Land refers to outline of top view of building.

  24. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. COSTS Land costs $400 per square unit. Land refers to outline of top view of building. 18

  25. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. COSTS Land costs $400 per square unit. Land refers to outline of top view of building. 15 18

  26. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. COSTS Land costs $400 per square unit. Land refers to outline of top view of building. 15 18

  27. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. COSTS A roof costs $10 each. ( A roof is any exposed top side of cube.) A window costs $5 each.

  28. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. COSTS Taxes will be collected based on building height. Floors 1-10 —> 50%  x land cost Floors 11-20 —> 1000% x land cost Floors 21-30 —> 2000% Floors 31-40 —> 3000% Floors 41-50 —> 5000%

  29. Engineering Solutions Event • Goal: Build a hotel that yields the highest profit. INCOME 4 windows, 1 roof = $600 4 windows, 0 roof = $500 3 windows, 1 roof = $300 3 windows, 0 roof = $250 2 windows, 1 roof = $200 2 windows, 0 roof = $175 1 window, 1 roof = $150 1 window, 0 roof = $125

More Related