1 / 31

Washington County ARES

Washington County ARES. May 2014. Visitors. Upgrades & Certificates. AuxCom. Stations – Served Agencies. Continuity Test. Does the Damn think work!. Continuity Test . 147.320 mhz Repeater ARRG 80m SSB 3.964mhz 40m SSB 7.248mhz DSTAR 440.550 KD7RFI B ( Bvtn ) DSTAR Simplex 147.54.

leane
Download Presentation

Washington County ARES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Washington County ARES May2014

  2. Visitors

  3. Upgrades & Certificates • AuxCom

  4. Stations – Served Agencies

  5. Continuity Test • Does the Damn think work!

  6. Continuity Test • 147.320 mhz Repeater ARRG • 80m SSB 3.964mhz • 40m SSB 7.248mhz • DSTAR 440.550 KD7RFI B (Bvtn) • DSTAR Simplex 147.54

  7. Continuity Test 2m/70cm Repeaters 2m Simplex WinlinkGateways WinlinkP2P PSK

  8. Continuity Test • Participants: 124 • Contacts: HF Voice 252 • Winlink P2P 3 • Winlink Gateway 173 • PSK32 5 • 2m & 70cm RPTR 318 • 2m Simplex 68 • DSTAR RPTR 31 • DSTAR Simplex 13

  9. Contacts • 863+ Contacts

  10. ICS 309 Samples

  11. IS 309 Sample

  12. ICS 309 WC7EOC

  13. Continuity Test Beaverton EOC

  14. Continuity Test Beaverton EOC

  15. Tigard Station

  16. What Worked • More participation than expected • HF Pactor worked well through the XE2 gateway on 20 meters in Mexico. • It was  a good exercise for training.  We could do more like this.

  17. What didn’t work • adding ICS forms to a file on the packet PC • Clean up address book • Need DSTAR for Dummies x2 • Update repeater list for all radios – including DSTAR • 40/80m difficult “Qualify” • DRATS • DSTAR DRATS proved unreliable through the Synopsis repeater

  18. Why We Do This • http://nyti.ms/1enRFR4

  19. Spring SET 2014 • Spring SET Apr 16th 0700-1400 • Wednesday • Everything works – Internet – Repeaters – Etc… be prepared for surprises • It’s about the connection to County Emergency Managers • Earthquake & Flooding Event • Small limited SET

  20. Spring SET Addendum • Steve N7BEF & Lynn KE7WKM activated for SET • 2 messages were sent Activation and a Quarterly Report • 2 messages were received from Ernie K7EAJ – Activation & Deactivation • No messages were received from our emergency manager

  21. One Weird Trick to: • To get S9 • Cut QRM • Make an antenna • Get on the air • Build….

  22. TIP: know what poison oak looks like. To be fair to our SEC, I don't think Vince got into any while tying off the end of the dipole

  23. TIP: this is the easiest way to get a rope over a tree branch that I have found. Lee KD7CNH tries the underhand fling from a bucket.

  24. Support structure

  25. Cut Tubing

  26. Slide over Terminal

  27. Training Day • Saturday September 13th 0900 to 1400

  28. Clear 0n Your Final • What Did I Miss

  29. Additions • Field Day need volunteers – EC will cook burgers • Annual Elections will be held at the June 2014 General Meeting. Ben Johnson(Chair), Ken Tolliver (Secretary), Rick Banton (Member-at-Large) and Paul Thutt (Member-at-Large) are the terms that are expiring. All wish to continue serving.

More Related