Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction. Institut IGH d.d. 6. Structures. Bridges More than 800 different structures. Institut IGH d.d. 6. Structures. Institut IGH d.d. 6. Structures. Institut IGH d.d. Tunnels Total length of tunnels: 85 km
E N D
Institut IGH d.d. 5. Construction
Institut IGH d.d. 5. Construction
Institut IGH d.d. 6. Structures Bridges More than 800 different structures
Institut IGH d.d. 6. Structures
Institut IGH d.d. 6. Structures
Institut IGH d.d. Tunnels Total length of tunnels: 85 km The longest tunnel: 5,79 km
Institut IGH d.d. 7. Financing •fuel tax: EUR 0,082/lit •toll collection • charges for the useof roadside land • loan proceeds • Total cost of motorway system 2001 – 2008: EUR 9 billion •loans: EUR 5.3 billion • average price per km: 8 million Average Anual Daily Traffic 2010: 12.404vehicles
Institut IGH d.d. 7. Financing Total toll collection revenue in 2010: €267 Mil Toll collection: I CAT:0,053 EUR/km II CAT:0,080 IIICAT:0,120 IV CAT:0,170
Institut IGH d.d. 8. Impacts (sustainability) Economy: transit, tourism, new jobs… Social impact: integration
Institut IGH d.d. 8. Impacts (sustainability) Roads open but also create new vistas Each generation of builders has the responsibility to leave the works worthy to be shown in postcard pictures.
Institut IGH d.d. 9. FuturePelješac Bridge
Institut IGH d.d. 9. FutureRailways + ports Connections to towns New concessions?
Institut IGH d.d. Thank you for your attention The Developement of Motorway network in Croatia