40 likes | 142 Views
Magnet Meeting 24/06/2008 - Krakow. Topics for discussion: Fixing interfaces and the interface document. The work on the TDR (what needs to be done, who does it, and editorial issues) The status of producing a field map for the simulations, and how this can be compared and cross checked.
E N D
Magnet Meeting 24/06/2008 - Krakow Topics for discussion: • Fixing interfaces and the interface document. • The work on the TDR (what needs to be done, who does it, and editorial issues) • The status of producing a field map for the simulations, and how this can be compared and cross checked. I. Lehmann, Magnets Krakow
Agenda • Minutes of last meeting • The interface document: Evie Downie • Discussion: Scope and timelines • Technical Design Report: Inti Lehmann • Discussion: • Missing parts • Distribution of work • Timelines • Field and Cryogenics: Andrea Bersani • Yoke design: Yuri Lobanov • Status and method to create a field map: Jost Luehning • Space in the Endcap: Genadii Alexeev • AoT I. Lehmann, Magnets Krakow
Technical Design Report Layout • Executive Summary to be filled • Introduction to be filled • Requirements on the Spectrometer Magnets to be filled • Target Spectrometer Overview migration? • Coil and Cryostat of the Target Spectrometer drafted • Iron Yoke of the Target Spectrometer drafted • Forward Spectrometer part. drafted • Infrastructure Requirements to be filled • Organisation and Management part. drafted • Conclusions to be filled I. Lehmann, Magnets Krakow
Technical Design Report Distribution of work • Executive Summary GR • Introduction IL • Organisation and Management IL • Spectrometer Overview RP,AV,GR,GA • Target Spectrometer • Requirements AB, YL • Coil and Cryostat AB • Instrumented Flux Return YL • Detector and Target Integration AB,YL • Performance • Forward Spectrometer IL + JL + EL • Infrastructure BL,DP • Timelines IL Timelines 1st full draft in September? Submit by Jan 2009. I. Lehmann, Magnets Krakow