Magnet Meeting 24/06/2008 - Krakow

Magnet Meeting 24/06/2008 - Krakow. Topics for discussion: Fixing interfaces and the interface document. The work on the TDR (what needs to be done, who does it, and editorial issues) The status of producing a field map for the simulations, and how this can be compared and cross checked.

leanne
Download Presentation

Magnet Meeting 24/06/2008 - Krakow

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Magnet Meeting 24/06/2008 - Krakow Topics for discussion: • Fixing interfaces and the interface document. • The work on the TDR (what needs to be done, who does it, and editorial issues) • The status of producing a field map for the simulations, and how this can be compared and cross checked. I. Lehmann, Magnets Krakow

  2. Agenda • Minutes of last meeting • The interface document: Evie Downie • Discussion: Scope and timelines • Technical Design Report: Inti Lehmann • Discussion: • Missing parts • Distribution of work • Timelines • Field and Cryogenics: Andrea Bersani • Yoke design: Yuri Lobanov • Status and method to create a field map: Jost Luehning • Space in the Endcap: Genadii Alexeev • AoT I. Lehmann, Magnets Krakow

  3. Technical Design Report Layout • Executive Summary to be filled • Introduction to be filled • Requirements on the Spectrometer Magnets to be filled • Target Spectrometer Overview migration? • Coil and Cryostat of the Target Spectrometer drafted • Iron Yoke of the Target Spectrometer drafted • Forward Spectrometer part. drafted • Infrastructure Requirements to be filled • Organisation and Management part. drafted • Conclusions to be filled I. Lehmann, Magnets Krakow

  4. Technical Design Report Distribution of work • Executive Summary GR • Introduction IL • Organisation and Management IL • Spectrometer Overview RP,AV,GR,GA • Target Spectrometer • Requirements AB, YL • Coil and Cryostat AB • Instrumented Flux Return YL • Detector and Target Integration AB,YL • Performance • Forward Spectrometer IL + JL + EL • Infrastructure BL,DP • Timelines IL Timelines 1st full draft in September? Submit by Jan 2009. I. Lehmann, Magnets Krakow