Composite Generator Enclosure PROJECT 99.12 New Castle Design Associates
Team 12 Composite Generator Enclosure Members: • Justin Schaffer • Tom Winward • Noel Goldstein • Jeremy Freeman • Partner: Center for Composite Materials • Advisor: Dr. Michael Keefe • Mission: It is our goal to design and construct a prototype portable generator enclosure made from composite materials that successfully satisfies all the wants and constraints defined by our customers, and to have a prototype built by April 1999. • Approach: We will first identify customers and their wants. We will also attempt to find all current technology in use for sound reduction and in the area of composites. Then concepts will be developed based on the information gained during our benchmarking. The best design will be determined by comparing our concepts with customer wants and constraints. Next we will begin a process of prototype design and evaluation, culminating with the production of a prototype part. This prototype is then to be further developed by CCM to fit the D Star generator.
Background • Army needs portable generator for use in remote locations • D-Star Engineering designing lightweight diesel engine • Team 12 to design a prototype enclosure • CCM to finish development for pre-production model
Customers • D-Star Engineering • U.S. Army • New Castle Design Associates • Safety Organization (NFPA) • Army Soldier • Home Owners • Construction Industry • Outdoor Entertainment • RV Owners • Emergency Services
Will not break Thermally Stable Quiet Portable Stackable Constraints • Maximum Size • Maximum Weight • Primary Materials Wants and Constraints Wants • Ease of Operation • Longevity • Ease of Maintenance • Cost • 15” x 16” x 30” • 25 LBS • Composites
Metrics and Target Values • Years of Exposure 10 yrs / 3000 hrs • Tg 350F / 800F • Weight 15 lbs • Cost $200 • Sound Level 35 dBA reduction • Drop Test 4 ft • Stackable 5 units high • Time to Access 10 min • Time to Start 1 min
System Benchmarking • Open Tubular Frame • Westerbeke Clamshell Enclosure • Honda Super Quiet Generators • Fisher Panda Generators • Previous UD NCDA Enclosure
System Level Best Practices • Years of Exposure Painted Metal • Tg N/A • Weight Open Frame • Cost Open Frame • Sound Level Enclosed Box • Drop Test ? • Stackable N/A • Time to Access Open Frame • Time to Start Electric Start
Functional Benchmarking • Sound Suppression • Accessibility • Ventilation/Heat Rejection • Stackable • Rolling • Carrying • Weather Exposure • Ease of Starting
Physical Model Testing 1 • Sound Testing • Temperature Testing • Unenclosed/ Enclosed • Load/ No Load • Enclosed • Forced Convection
Physical Model Testing 2 The Equipment Sound Test
Critical Concepts Wants Concepts • Stackable • Access to interior • Portable • Quiet, Longevity, Cost, Will not break, Thermally stable • Rectangular • Panels (removable, hinged, sliding) • Handles, Wheels • Composite sandwich
Concept #1 • 6 removable access panels • Advantages • Easy Access • Disadvantages • Not Structurally Sound • “Hand Buggy” Style • Advantages • Easy to Use Outdoors • Disadvantages • Increases Height
Concept #2 • “Clam Shell” Design • Advantages • Easy Access • Disadvantages • Large Stress Concentrations • 4 Dolly wheels • Advantages • Easy to Roll on Smooth Floors • Disadvantages • Difficult to Use Outdoors
Concept #3 • Sliding Side Door Access • Advantages • Easy to Use • Disadvantages • Limited Access • Multiple roller wheels • Advantages • Easy to Use on Smooth Floor • Disadvantages • Difficult to Use Outdoors
Concept #4 • 2 Piece Shell Access • Advantages • Easy to Use • Disadvantages • High Stress on Latches
Mobility Access Composite Structure Final Concept Selection • Hand Buggy Style • with Additional Handle • Multiple Panels at Critical Locations • Ciba Resinfusion 8605 Epoxy, E-Glass and Kevlar Fibers, Foam Core
Final Concept Multiple Handles Removable Top Panel Recessed Wheel Hinged Starting Panel
Budget To Date: • Materials: ………………………...$20.00 • Miscellaneous:…………………....$60.00 Predicted: • Materials:………………………..$580.00 • Miscellaneous:…………………....$45.00 • Total Spent:……………………...$705.00 • Total Remaining:……………….$2045.00
Est. Engineering & Shop Hours Build Mold……………………………120 Make Enclosure………………………..80 Testing…………………………………40 Reevaluate/Redesign…………………160
Conclusion Present Design Future Work FEA Build & Test Prototype