Los Angeles Valley College Prop J Master Plan. Town Hall Presentation. Master Planning Process. Proposition A/AA 2001/2003 $286 million Measure J 2008 $350 million. 2006 Facilities Master Plan, BTA. Master Planning Process. Prop A/AA Projects. Master Planning Process.

lee-snider
Download Presentation

Los Angeles Valley College Prop J Master Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Los Angeles Valley College Prop J Master Plan Town Hall Presentation

  2. Master Planning Process

  3. Proposition A/AA • 2001/2003 • $286 million • Measure J • 2008 • $350 million 2006 Facilities Master Plan, BTA Master Planning Process

  4. Prop A/AA Projects Master Planning Process

  5. Prop A/AA Projects Master Planning Process

  6. Prop A/AA Projects Master Planning Process

  7. Prop J Projects • Media Arts Building • LAVC Community Work Force Development Center • Athletic Training Facility • Planetarium Building Expansion • Performance Art Center • Multi-purpose Community Services Center • General Campus Improvements • Parking Structure • Student Support Services • Business Technology Building • New Environment Center • Campus Modernization – Outdoor Facilities and Infrastructure • Valley Satellite LAVC, Aerial View Master Planning Process

  8. FMP WORKSHOP 1 FMP WORKSHOP 2 FMP WORKSHOPS 3 & 4 FMP WORKSHOP 5 FMP WORKSHOP 6 FMP WORKSHOP 6 Master Planning Process > Master Plan Components

  9. Goals & Vision • Guiding Principles • Planning Outcomes • Measurements for Success • Master Program • Campus-wide Space Utilization • Existing Building Plans with Departmental Space Assignments • Lecture/Lab Utilization • Proposed Location Plan of Each Department on Campus Master Planning Process

  10. Facilities Master Plan • Conceptual Plan • Circulation • Vehicular/Parking • Service • Pedestrian • Buildings • New, Renovate, Expand, Demolish • Options Development • Buildings & Massing • Open Space/ Athletic/ Recreational • Landscape • Sustainability Prop A/AA Master Plan, BTA Master Planning Process

  11. Guidelines & Standards • Architectural • Landscape • Signage • Lighting • Information Technology • Audio Visual • Hardware & Access Control • Direct Digital Control Systems • MEP Systems • Fire Alarm • Landscape Irrigation Allied Health and Sciences Center Monarch Square Master Planning Process

  12. Infrastructure Master Plan • Electrical • Technology • Chilled & Hot Water System • Water • Sanitary Sewer • Storm Drain • Gas • Implementation, Phasing & Cost • Horizons – Short term and long term • Coordinated Scopes of Work • Phasing • Temporary Facilities • Cost Student Services Center, Groundbreaking Master Planning Process