Commercial Food Sanitation KPI Discussion 1/23/14
Agenda • Introduction • KPIs • Periodic Infrastructure Cleaning • ATP / APC • Pre-op Inspection performance • SSOPs • Preventative Maintenance • Positive Swabs • Number of Lines < 4 on Continuum
KPI Items to Report Monthly Periodic Infrastructure Cleaning % Complete ATP & APC Compliance Pre-op Inspections Environmental Monitoring Results Preventive Maintenance Report by the 5th of the following month
KPI Items to Report Quarterly Continuum numbers < 4 Average of Continuum ratings Report on the 5th day of the 1st month of the quarter for the previous quarter.
The Importance of Period Cleaning • Sustainable • Captures tribal knowledge • Allows consistency • Tasks assigned frequency • Measures Success • Calculate % completion rate
Reasons for Period Cleaning? • Micro: pathogen, spoilage-shelf life • Allergen management • Pest control • Product quality • Regulatory /internal company requirements • OSHA-Safety-dust control
The Importance of Period Cleaning • Sanitary Design • Legacy Infrastructure • Design Flaws • New Infrastructure • Design Flaws • Food Safety is at Risk • Product contamination • Human Safety is at Risk • Dust build up • Plant Appearance
Periodic Infrastructure Cleaning – PIC • Periodic Infrastructure Cleaning (PIC) • Infrastructure and non-processing equipment • Examples • Processing room deep clean: • Walls • Floors • Hoist track • Etc… • Coolers • Warehouse • Pallet jacks/fork lifts • Floor scrubbers • Etc…
Program Development and Frequencies • Program Development • 52 week annual cycle • All infrastructure listed • All non processing equipment listed • Updated/modified as needed • Annual review • Frequencies • Weekly: Complete during the 7 day week • Monthly: Complete within plus/minus 5 days of due date • Quarterly: Complete within plus/minus 8 days of due date • Bi-Annual/Semi-Annual:Complete within plus/minus 15 days of due date • Annual: Complete within plus/minus 30 days of due date
Program Documentation and Reporting • Documentation • Reviewed weekly • Documented and verified immediately • Signed off by employee • Verified and documented by supervisor • Document any corrective actions/deviations • Reporting • Monthly • PIC starting 2/14 • PEC starting 5/14 • Percentage completion rate • Report PIC and PEC separate
Monthly Calculating and Reporting Calculation Formula: • Calculated by dividing the total number of completed tasks by the total number of tasks scheduled during a specific calendar time frame. • Example: • 100 PIC tasks due • 97 PIC tasks completed • 97 / 100 = 97% complete
Program Development • What is Needed • Area/equipment description • PIC/PEC • Task description • Frequency • SSOP reference • Responsible party • Completion column • Verification signature • Corrective action