BIM Overview Stacy Scopano
Traditional Process DOC DOC DOC DOC DOC
Conceptual Phase Schematic Phase Design Development Architect Structural Mechanical Electrical ...Civil... Construction Documents Fabrication HVAC Steel Precast Contractor Fire Protection Construction Phase Cast-in-Place Plumbing
As-Required Requirements As-Designed Design As-Planned Implementation plan As-Built Implementation in construction. As-Maintained Facility Management • Greatest Industry Challenges: • Data Recreation • Error due to Human Interpretation
As-Required Requirements As-Designed Design As-Planned Implementation plan As-Built Implementation in construction. As-Maintained FM $15.8 billion in annual interoperability costs were quantified for the capital facilities industry in 2002. Of these costs, two-thirds are borne by owners and operators, which incur most of these costs during ongoing facility operation and maintenance (O&M). In addition to the costs quantified, respondents indicated that there are additional significant inefficiency and lost opportunity costs associated with interoperability problems that were beyond the scope of our analysis. Thus, the $15.8 billion cost estimate developed in this study is likely to be a conservative figure. • Greatest Industry Challenges: • Data Recreation • Error due to Human Interpretation
BIM process Phases of Adoption BIM based process • BIM as “deliverable” • Lonely BIM DOC DOC DOC DOC DOC Drawingbasedprocess
Future “Transactions” The ”Cloud” Native data (Master) Native data (Master) Native data (Master) BIM software BIM software BIM software
Visual Transaction Example • Coordinate mechanical & structural designs • Penetration request • MEP designer creates request • Structural designer approves request and creates penetration • MEP engineer modifies design • Modifies the penetration request • Structural designer recognizes the change and adjusts
An innovative case New Meadowlands Stadium
2 Ready to ship 1 3 Manufactured Received on Site RFID Tag RFID Tag RFID Tag TabletPC with RFID Reader RFID Tag VelaSystems Servers (Vela Hosting Facility) 3D Model 4 Erected Reports Visualizing the Supply Chain Factory Jobsite Internet