1 / 4

consultores bim

Proyectos BIM | Descubre cu00f3mo hemos ayudado a nuestros clientes a desarrollar proyectos complejos, optimizando costos y tiempos de construcciu00f3n.<br><br>https://www.buildbim.cl/proyectos/

Download Presentation

consultores bim

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ABOUT US Founded in 2012, we are a Chilean-New Zealand company created to take full advantage of the collaborative qualities of Building Information Modeling (BIM). Our goal is to become an integral part of our clients' operations, developing synergies that improve their productivity. SERVICES BIM Management and BIM Execution Plan Project Reports and Performance Statistics Multidisciplinary Coordination Interference Detection Construction and logistics sequence BIM audit 4D and 5D Modeling and Documentation Family and Object Development As Built Models for Asset / Facility Management Digital Precast Construction BIM ISO 19650 implementation Consulting

  2. 1.OUR WORK &OUTSTANDING PROJECTS CARABINEROS SUBCOMMISSION, PLAYA BLANCA, ANTOFAGASTA, CHILE. Bortnik Yurisic Arquitectos was awarded the public tender for the replacement of the Carabineros Sub-police Station in Playa Blanca, Antofagasta, and has commissioned BuildBIM to develop the digital coordination of the project. The building has a total of 1,395 m2 built and includes public, security, administrative, habitability and mobilization and support areas. The general concept is developed based on 3 elements: lower stratum (base), upper stratum (habitable volume) and protective perimeter (exterior image). The project has a semi-sunken level of parking, and 3 habitable levels, including passive and active energy efficiency systems. EL NOGAL BUILDING, VITACURA, SANTIAGO, CHILE. The El Nogal Building is owned by Inmobiliaria Inspira , who, through the Ducci Technical Inspection office, commissioned BuildBIM to develop the model for coordination and preparation of the project's geometric and regulatory interference report. The Building designed by Matías Silva & Arquitectos has 2 parking spaces and 7 floors.

  3. ÁLVAREZ BUILDING, VIÑA DEL MAR, VALPARAÍSO REGION, CHILE. The project located in a highly complex topography was commissioned by the Ducci technical office to BuildBIM, for the development of the model for coordination and preparation of the report of geometric and normative interferences of the Álvarez Building, which has 211 apartments on 17 floors and 7 levels underground, level -5 houses the commercial premises. of architecture was developed by RSAI . BUILDING BROWN NORTE, ÑUÑOA, SANTIAGO, CHILE. Ducci commissioned BuildBIM to develop the model for the coordination and preparation of the geometric and normative interference report for the Brown North Building, which has 52 apartments on 5 floors and 2 underground levels. The architecture project was developed by RSAI .

  4. 2.SOLUTIONS FOR THE AEC INDUSTRY OPEN COLLABORATION DRIVEN BY BIM We aim for a coordinated design ensuring accurate and reliable documentation for cost estimation, construction, manufacturing and facility management . We use the latest technology for the digital construction of the life cycle of buildings, from the study of space to asset management . FOR MORE INFO VISIT -https://www.buildbim.cl/ CONTACT INFO CHILE Location: Av. Providencia 1208, of. 509 Providencia, Santiago, 7500571, Chile Telephone: +562 2 946 24 93 Email: admin@buildbim.cl

More Related