UDIT PROVISIONING EXAMPLE: A CLEC has ordered an OC-12 UDIT from Qwest wire center A to Qwest wire center Z. Existing IOF facilities from A to Z are OC-3capable only. Possible alternate routes are evaluated for capacity. Note, routes between wire centers can measure
E N D
UDIT PROVISIONING EXAMPLE: A CLEC has ordered an OC-12 UDIT from Qwest wire center A to Qwest wire center Z. Existing IOF facilities from A to Z are OC-3capable only. Possible alternate routes are evaluated for capacity. Note, routes between wire centers can measure hundreds of miles in length and there is potential for more than one alternate route. Engineer makes determination and Alternate Route 1 is provisioned for CLEC. Figure A Qwest Wire Center A CLEC Collo OC-48 CLEC requests OC-12 UDIT from A to Z 2 Qwest Wire Center B 1 OC-3 LATA ABC OC-192 OC-12 OC-48 1 Qwest Wire Center Z 2 OC-48 Qwest Wire Center C 2 L E G E N D Existing IOF Possible UDIT Route 1 Docket No. UT 003013, Part D Exhibit RJH-9 November 7, 2001 Possible UDIT Route 2 CLEC requests OC-3 E-UDIT from Z to CLEC location CLEC Wire Center Qwest Remote Terminal Qwest Wire Center Z Existing Loop Fiber Facilities E-UDIT PROVISIONING EXAMPLE: A CLEC orders an OC-3 E-UDIT from Qwest wire center Z to its location within the wire center boundary. Where spare loop facilities are available, Qwest will provision the E-UDIT to the customer location. Wire Center Boundary L E G E N D Existing Local Loop Facilities Figure B E-UDIT Route