Wrington Vale Medical Practice Development Detailed Business Case

Wrington Vale Medical Practice Development Detailed Business Case. Extraordinary Board Meeting 17 th December 2010. Background. OBC approval May 2009 - financial envelope £170k, clarity on benefits, consultation, space

leigh
Download Presentation

Wrington Vale Medical Practice Development Detailed Business Case

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wrington Vale Medical Practice Development Detailed Business Case Extraordinary Board Meeting 17th December 2010

  2. Background • OBC approval May 2009 - financial envelope £170k, clarity on benefits, consultation, space • Consultation – Nov.2009 to March 2010. Report received by Board in July 2009. • Strong message re potential loss of local service in Wrington • Detailed Business Case received – Nov 2010 • 6 week Assurance Process • Addendum from practice reflecting changes arising from the assurance process.

  3. Public Involvement and Engagement • PCT collated post-consultation feedback • Health Overview and Scrutiny Panel update • Project Board with lay membership • Two recent public meetings by the practice: • Stronger voice from patients in other areas served by the practice in support of single site • Concerns from Wrington people re longevity of solution to meet their needs

  4. Assurance Process • Consultation outcomes reflected in Practices review of options appraisal • Non-financial Benefits Appraisal • Space requirements that are in line with national guidance, list size and service needs • Financial Appraisal • Project Board consideration; PCT Directors, Lay members drawn from Consultation Reference Group

  5. Non-financial Benefits Appraisal • Weighting of criteria reflected response from consultation • Ease of access most important • More services for patients next in importance • 5 service delivery model options appraised • Remaining 3 options scores close but practices preferred option, single site + presence in Wrington, consistently highest

  6. Financial Assurance – Space comparisons • List size, GP full time equivalents, no of clinical sessions have informed table below:

  7. Value for Money • District Valuer’s opinion led to consideration of and changes to baseline assumptions including build cost, fees and developer costs • Benchmark of other schemes in region • National guidance on space for practices of the size of WVMP • Reduction in build cost saves 5% • Car park spaces significantly reduced in number

  8. Conclusion of Financial Appraisal • Space allowance = 890m2 • Car park spaces reduced to 56 • Project cost brought below £2m • Build cost £m2 reduction • Site value appraised independently • Fees and developer costs reduced • Current market rent p.a. £145k for main site

  9. Key Benefits for Patients • Sustainable high quality, local, primary healthcare • Better patient experience and environment • Additional services • Extra clinics, GP and nurse, some more evenings and at weekend • New services e.g. Physiotherapy, Hot Foot clinic, visiting consultants and nurse specialist • Preventative and self-care health shop • Opportunities for the future: • One stop shops and visiting diagnostics e.g. ultrasound • Increased collaboration with community groups

  10. Benefits for the Practice and Staff • Improved working environment and facilities • Expansion of training facilities • Better communications between multi-disciplinary team • Strengthens recruitment and retention • Improved job satisfaction due to integrated team working • More efficient business model • Reinvestment of productivity in services to attract and retain patients

  11. Key challenges - planning permission • Sequential test will apply to any development site eg consideration of: • Forest of Avon/area of protected species and habitats • Settlement boundaries • Flood zones • Safeguarding of land by policy • Pudding Pie Lane site constrained but: • All other sites more constrained at time of appraisal for this business case • Centrally located for the practice population • Best meets Practice’s business model

  12. Other Key Challenges • Time of uncertainty • Policy direction - detail of this emerging • Economic challenge ahead • Timeliness of development: • Meeting CQC standards by 2012 • Practice sustainability • NHS delivery challenges; QIPP, shift closer to home, integration of services

  13. Recommendations • Note the outcome of the assurance process • Approve the Practice’s preferred service option of consolidating onto one main site • If main site is Pudding Pie Lane/Langford, approve a presence in Wrington • Approve a maximum financial envelope of £158.5k per annum: • £145k for Current Market Rent (CMR) on the new main site and • £13.5k per annum rent for the presence in Wrington if required.

  14. Next Steps for the PCT • Support the practice/developer in relation to the planning application etc • Support and advise the practice on public involvement and engagement • Agree detailed benefits realisation plan (service and facilities) and timescales with the practice • Continue to work with practice to demonstrate value for money solution • Rent review detail to be agreed with practice/ developer as part of DV “sign off”