An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Datafill Kick-Off Vodafone-Huawei, 27th August, 2010

  2. Contents of Presentation Contents • Overview of Data-fill process (Process & lead times/Tools) • Huawei data-fill template (filled with 3 example eNBs configured) • Parameters to be planned /configured • Radio Parameters • Transmission parameters • Equipment parameters • List of default parameters(to be customized) • Open issues

  3. Configuration Procedure Preparation “Open” Engineering Parameters New sites information Radio planning output Transmission negotiated setting Default or Customized Internal equipment parameters setting Fill into the external template (EXCEL) M2000 / CME eNodeB Rollout Export XML / DHCP / EDS for eNodeB Verification

  4. Process & Lead times Clarify Inconsistencies CME Generation of eNodeB xml files Data from VDF No Import CME templates Yes Consistency Check Second Consistency Check No Yes Planning, Definition of site specific parameters Update EPC data 3 days 1 day 3 days 1 day 3 days 2 weeks

  5. Overview of CME … CME:Configuration Management Express Overview of CME CME—Configuration Management Express M2000 CME Rules checker CME P N P F M P M … Scripts generator Data Area Mgmt Data Template Mgmt Multiple Version Scheduling M2000 Platform ERAN DB WRAN DB GRAN DB Scripts Executor XML CME-M2000 Bridge eNodeB 1 current data Area + planned Areas N Radio Transport Equipment Workflow in Planned Area: Data Update Data Check Data Activate L B B P L B B P L B B P L M P T .… U P E U

  6. Contents of Presentation Contents • Overview of Data-fill process (Process & lead times/Tools) • Huawei data-fill template (filled with 3 example eNBs configured) • Parameters to be planned /configured • Radio Parameters • Transmission parameters • Equipment parameters • List of default parameters(to be customized) • Open issues

  7. Overview of External Template Huawei External Template • Common Network / SAE information • External template is used to collect the parameters which should be planned and optimized in initial deployment. • The external template file can be used as an input to CME to create initial data file. • The template collects four types data • Common Data (Global Data) • Equipment Data • Transport Data • Radio Data • Equipment Internal equipment setting • Device IP • IP Route • Local IP & Peer SecGW Transmission planning setting • VLAN • RF engineering parameters • Neighbor eNodeBs Radio planning setting • Cell Basic Parameters

  8. External Template(1/10) • Common(1/2)

  9. External Template(2/10) • Common(2/2)

  10. External Template(3/10) • Equipment

  11. External Template(4/10) • Device IP

  12. External Template(5/10) • IP Route

  13. External Template(6/10) • RF engineering parameters

  14. External Template(7/10) • Local IP & Peer SecGW

  15. External Template(8/10) • VLAN

  16. External Template(9/10) • Neighbor eNodeBs

  17. External Template(10/10) • Cell Basic Parameters

  18. Contents of Presentation Contents • Overview of Data-fill process (Process & lead times/Tools) • Huawei data-fill template (filled with 3 example eNBs configured) • Parameters to be planned /configured • Radio Parameters • Transmission parameters • Equipment parameters • List of default parameters(to be customized) • Open issues

  19. Overview of External Template Parameters to be planned(1/5) • Common Parameters

  20. Overview of External Template Parameters to be planned(2/5) • Radio Parameters

  21. Overview of External Template Parameters to be planned (3/5) • Transmission Parameters

  22. Overview of External Template Parameters to be planned (4/5) • Equipment parameters

  23. Overview of External Template Parameters to be planned(5/5) • Default parameters(to be customized) • These default parameter list is based on current Huawei parameter base line and should be customized based on result of Feature/Parameter stream.

  24. Contents of Presentation Contents • Overview of Data-fill process (Process & lead times/Tools) • Huawei data-fill template (filled with 3 example eNBs configured) • Parameters to be planned /configured • Radio Parameters • Transmission parameters • Equipment parameters • List of default parameters(to be customized) • Open issues

  25. Open issues • How to fill the template ? • Delivery of data for Early Bird / after early Bird • Parameter ranges for IP address\, TAC ... assigned by VF for Huawei network • Next steps ? • Other open issues ?

  26. Thank You www.huawei.com