June 18, 2014|3:00PM -5:00PM | ROOM 1E-108

June 18, 2014|3:00PM -5:00PM | ROOM 1E-108. Agenda. 3:00 Call to Order, Approval of Agenda, Approval of June 4 th Meeting Minutes – Co-Chairs Lynde and Mathews Public Comment 3:20 CAC Feedback on East Link Environmental Mitigation- Co-Chairs Lynde and Mathews 3:50

lenore-king
Download Presentation

June 18, 2014|3:00PM -5:00PM | ROOM 1E-108

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. June 18, 2014|3:00PM -5:00PM | ROOM 1E-108

  2. Agenda • 3:00 • Call to Order, Approval of Agenda, Approval of June 4th Meeting Minutes – Co-Chairs Lynde and Mathews • Public Comment • 3:20 • CAC Feedback on East Link Environmental Mitigation- Co-Chairs Lynde and Mathews • 3:50 • 130th Station Design • Landscape Development - Matthews Jackson and Sound Transit • 4:50 - Public Comment Light Rail Permitting Citizen Advisory Committee

  3. East Link Environmental Mitigation CAC Feedback from June 4th CAC Meeting • Provided Documentation • Level of Documentation • Mitigation Approach • Additional Information Light Rail Permitting Committee

  4. Bel Red Design and Mitigation Permit 130th Station Site BR-RC-1 Zoning District - The purpose of the Bel-Red-RC-1 Land Use District is to provide an area for a mix of housing, retail, office and service uses within the core of a nodal area, with an emphasis on housing. The district is limited in extent in order to provide the level of intensity appropriate for areas in close proximity to the highest levels of transit service within the Bel-Red area. • 150 Feet Height • Minimum Structure Setbacks are 0 • 75% Maximum Impervious Surface Landscape Development 20.25D.110 Landscape Development Interim Versus Future Condition Applicable Standards a. Transit Boulevard Landscaping: NE 15th/16th Street: i. Corridor Design approval through Transportation Department. b. 130th Avenue Shopping Street north of NE 15th/16th Street: i. Corridor design approval through Transportation Department. ii. Dimensions: Sidewalk: nine ft. Planting: five ft. Light Rail Permitting Committee

  5. Bel Red Design and Mitigation Permit Alternative Landscape Option Consultant Streetscape Proposal EAST LINK STREETS Sound Transit’s East Link rail alignment creates a unique street typology through the Be lRedCorridor that should be expressed and highlighted through the selection of a tree equally unique that also satisfies light rail’s operational criteria. Magyar Ginkgo has been selected for its leaf with rare parallel venation (similar to rails), brilliant fall color, and upright form which will not interfere with the rail system’s overhead catenary system. Plant Selection Criteria: • Consistent with system palette for rider understandability • Satisfies operational criteria of rail Recommendation: • Magyar Ginkgo (Ginkgo biloba ‘Magyar’) Light Rail Permitting Committee

  6. Next Meeting Wednesday, July 2 • Presentation on City Noise Code – Kate Berens • Bel Red Tree Mitigation – Sound Transit • Bel Red Arts Update - Tentative Light Rail Permitting Committee