Preparation for station five

Preparation for station five. Construction/bundling/connectorisation. Bundling. New comb ready: Comb in use Fibres trimmed on rubber sheet with cutter knife: - align centre fibre on horizontal white line - trim fibres along vertical white line. QA image for one connector

leo-huffman
Download Presentation

Preparation for station five

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation for station five Construction/bundling/connectorisation

  2. Bundling • New comb ready:Comb in use • Fibres trimmed on rubber sheet with cutter knife:- align centre fibre on horizontal white line- trim fibres along vertical white line QA image for one connector (# of fibres in a bundle) Polished surface Cut surface

  3. Connectorisation • Bridge ready:Bridge in use • Fibre radius guide during connectorisation QA image for one connector (# of fibres in a hole)

  4. Check sheet – in preparation

  5. Light source • LED survey finished:EG-5UV405-15 from ETG Inc.- Peak 405 nm, range 400-410 nm- 12 mW outputnow in hand. • Optics:- spherical lens for collimation is ready- cylinder lens for focusing is ready- preparing mount for lens- needs mechanical slits

  6. Mechanical • Connector:patch-panel connector for external waveguide revised to have gland • URGENT:- go-nogo gauge to be made- station connectors to be made • Carbon-fibre station- needs to be machined for connector holes • Doublet-layer- want the first doublet-layer as soon as it is ready so that we can start work during manufacturing of the second/third doublet-layers. • That’s all!