1 / 6

ETSI TC MTS, Security SIG in MTS (Methods for Testing and Specification)

ETSI TC MTS, Security SIG in MTS (Methods for Testing and Specification). Jürgen Großmann, Fraunhofer FOKUS juergen.grossmann@fokus.fraunhofer.de. TR 101 583: Security Testing Case Studies -- Progress. Final draft for approval currently underway

leoma
Download Presentation

ETSI TC MTS, Security SIG in MTS (Methods for Testing and Specification)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ETSI TC MTS, Security SIG in MTS (Methods for Testing and Specification) Jürgen Großmann, Fraunhofer FOKUS juergen.grossmann@fokus.fraunhofer.de

  2. TR 101 583: Security Testing Case Studies -- Progress • Final draft for approval currently underway • Currently resolving some minor version/editing issues wit Edit!Help Security SIG in MTS, 4-5 October 2011

  3. EG 203 251: Risk-based Security Testing • Document Progress • Work plan produced • Initial draft structure provided • Sections on terms and concepts, risk-based security testing and test-based risk assessment defined • Initial draft for: Risk-based security test planning, risk-based security test design, risk-based security test selection • Open Issues • Feedback from Security SIG on initial draft required • Milan will provide feedback until next meeting. Security SIG in MTS, 4-5 October 2011

  4. EG 203 251: Security Assurance Lifecycle-- Progress • Document Progress • Work Plan produced and updated • Initial draft structure agreed, • Design section of LifeCycle drafted • Open Issues • Integration of information from other WI required (ongoing) • Discussing whether to have a joint WI with TC Cyber Security SIG in MTS, 4-5 October 2011

  5. TR 101 583: Security testing terminology-- Progress • received comments and additional sections: done • integrate comments: done • move from TS -> TR: done • discussing conflicting terms: open • review by external experts: open • clarify WI name with Emmanuelle • New version until end of CW22 • Move forward based on next MTS SIG meeting: • next draft: after next SIG conference call (June 2014) • for approval: following MTS meeting (October 2014) Security SIG in MTS, 14th January 2014

  6. Next steps • Jan will sent the ISO document on security testing to Jürgen and Jürgen will distribute the document to the SIG • Discussion relation to TC Cyber, report from Ian, identify synergies • Ari will provide a new version of SecTestTerms at the end of CW22 • Next meeting Tuesday, June 17th, 2 pm