1 / 9

Cryo and AFE IIt Update

Cryo and AFE IIt Update. MICE Video Meeting April 12, 2006 A. Bross. Cryo Update I. The cryo-system for the VLPCs has been operated extremely reliably and stably from May 05, through the end of the KEK TB and now for about 2 months again at Fermilab

leona
Download Presentation

Cryo and AFE IIt Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cryo and AFE IIt Update MICE Video Meeting April 12, 2006 A. Bross

  2. Cryo Update I • The cryo-system for the VLPCs has been operated extremely reliably and stably from May 05, through the end of the KEK TB and now for about 2 months again at Fermilab • However, it was felt that the thermal-link design could be made more robust • A bolted concept has now been detailed and will be used in all subsequent systems • Assembly details still need to be worked out • Vacuum tests on the bolt to envelope weld were successful • The drawing package is complete and we have awarded the bid to Ability Engineering for $140k for 4 systems • Does not include • Cryo-coolers • Temperature controlers and sensors • Lid Heater circuitry • Cassette He gas system • New Thermal link design is incorporated even though is has not yet been tested. • We will retrofit the prototype system and test design. • Will occur in June

  3. Cryo Update II

  4. Cryo Update III • However II • Need to solve an assembly problem at upper thermal link

  5. AFE IIt Update • The AFE IIt pre-production boards (15) have now all arrived at Fermilab and 5 or 6 are under test • The first boards came up very quickly • In about 1 hour • No green wires! • TriPt testing is done • Yield is about 80% • More than enough chips for D0 + MICE + Spares for both experiments • Plus second pass could yield more • Expect Production Order has been released • About 14 week lead for delivery of all boards • But many will arrive earlier • The critical issue for MICE is MICE-specific firmware development for AFE IIt • NOT a Trivial amount of work

  6. AFE IIt

  7. JW@FTG, 2006Mar21 LED Spectra:AFE1 AFEII

  8. Issues that still Need some Thought • AFE IIt board temperature and bias calibration • Does MICE need a test stand (like D0 has) to do this operation? • LED pulser data • Plan to dismount wavguides and mount a LED pulser or excite the fibers with blue LEDs? • New LVSB Board • Not likely. Existing board looks OK. 6 new boards are being assembled now. • Firmware development still might be needed • May be able to get support for this from Fermilab CD • Rate • If we keep analog and timing information we are limited to: • »250 muons per msec of spill • It is possible that clever (extreme) programming of the AFE IIt can push this up a bit. • If we drop analog and timing and only use discriminators, we can run at 7 MHz.

More Related