1 / 28

Supplier Relationship

Supplier Relationship. 2002 년 11 월 29 일 금 김해중 MAI LAB. Contents. Relationship performance dimensions of buyer-supplier exchanges Production Quotas as Bounds on Interplant JIT Contracts. Relationship performance dimensions of buyer-supplier exchanges. Tom O’Toole*, Bill Donaldson**

leora
Download Presentation

Supplier Relationship

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Supplier Relationship 2002년 11월 29일 금 김해중 MAI LAB

  2. Contents • Relationship performance dimensions of buyer-supplier exchanges • Production Quotas as Bounds on Interplant JIT Contracts

  3. Relationship performance dimensions of buyer-supplier exchanges Tom O’Toole*, Bill Donaldson** *School of Accountancy and Business Studies, Waterford Institute of Technology, Waterford, Ireland **Graduate School of Business, University of Strathclyde, UK European Journal of Purchasing & Supply Management 8 (2002) 197~207

  4. introduction • Relationship • 1970s in Europe. IMP(Industrial Marketing and Purchasing) group • Partnership management - Ellram, 1995 • Outsourcing strategic alliance - Mullin, 1996 • Supply chain co-operation and collaboration • Strategic role, potential relationship Supplier Buyer Objective A definition of buyer-supplier relationship performance Relational performance measures

  5. B2B relationship performance • 3 Major problems • Lack of relationship performance from models • IMP group’s dyadic interaction(1982) • Dwyer et al: relationship development(1987) • Morgan and Hunt’s: commitment-trust model(1994) • Mohr and Spekman: model of partnership model(1994) • Anderson and Narus: distributor-manufacturing firm working partnership(1990) • Narrow definition of performance • Transaction cost • Cost savings for one party • Cost of potential relational abuses and the monitoring of a partnership • Theoretical borrowing • Financial perspective solely

  6. The Study • Qualitative findings-explore dimensions • Interviews – 7 firms • 2 small, 2 medium, 3 large firms • 3 suppliers, 4 buyers • Financial/non-financial dimensions • Quantitative findings • Mail survey of 500 UK industrial buyers in manufacturing • 62% procurement managers, 19% managing director, 13% manufacturing manager, 6% others • 5-point scale, 21 items measuring performance • Response rate 47%, 200.

  7. Non-financial performance statements • 다른 공급사와 비교해서 얻는 전반적인 이득은? • 납기 시간은? • 품질은? • 문제에 대한 반응 속도는? • 관계가 행복한가? (We are happy with this relationship) • 관계가 안정적인가? • 서로 합작 프로젝트를 수행하는가? • 제품 설계 시 협업을 하는가? • Financial performance statements • 다른 공급사로의 전환이 어려운가? switching cost • 관계가 서로 의존적일수록 더 이득인가? • 과도한 의존에 대해 대처가 쉬운가? • 정보와 지식을 공유해야만 하는가? • 비용절감은? • 지불하는 가격이 낮은가? • ROI는 높은가? • 장기 수익률은? • 비용 공유는? • 구매 물량은? • 운영비용은?

  8. Findings and Discussion • correlations

  9. Factor Analysis - Oblimin rotation matrix

  10. Non-financial dimension

  11. Factor 1 • Speed of response • Product quality • Benefits comparison • Lead time Operational relationship effectiveness from buyer’s perspective Factor 2 • Satisfaction • Stability • Value diff. to quantify • Flexibility • Joint value projects Long-term interaction Strategic Factor 3 Close relationship • Involvement in design

  12. Financial

  13. Factor 1 • Switching • Interdependence • Cost sharing Measures of dependency Factor 2 • Confidence abuse • Share information Trust Factor 3 • Prices • ROI • Profitability • Bought volume • Cost of running Traditional economic measures

  14. Conclusion • Financial / non-financial dimensions • Broadened conceptualization • Single actor perspectiveMutual Relationship

  15. Production Quotas as Bounds on Interplant JIT Contracts Izak Deunyas*, Wallace J. Hopp**, Yehuda Bassok** *Department of Industrial and Operations Engineering, University of Michigan, Michigan **Department of Industrial Engineering and Management Sciences, Northwestern University, Illinois Management Science/ Vol.43, No.10 (1997)

  16. Introduction(1/2) Clutch manufacturing plants • External supplier to US and Japanese car manufacturers • Demand is driven by production in downstream plant, stochastic Pull Production System Low Inventory High Responsive

  17. Introduction(2/2) • 3 month ago: 1,404 units  2 month ago: 1,296 units  a month ago: 9,396 units  Actually 4,752 units Demand Uncertainty Ignore!! Visibility to future demand? No Objectives • Structure for the negotiated bounds on the JIT contracts • Optimal quota • Demand + Production variance  cost + quota levels • Quota proposal for supplier

  18. Literature Review • Card count-setting • Production quotas-setting • Optimal overtime policies • Uncertain capacity and demand • Single period • Optimal (s,c,S) policy Uncertain Demand Uncertain Production Safety Capacity Multi-period

  19. OT decision is made RT OT RT OT Tn+1 Tn Un Dn is revealed Dn+1 is revealed Q D Q* Y t Model • Assumptions • Periodic production quota=target inventory level • Regular time + Safety capacity • Demand is uncertain • D>Q: Sales loss, D<Q:Holding cost

  20. Notation • P : 제품 가격 • CR: 정규시간 동안의 비용 • C: overtime의 제품당 비용 • K: 잔업을 위한 setup비용 • Sn: 기초재고 n • Rn: 잔업 전의 재고 n • Dn: 수요 n. continuous density function fD, FD • Yn: 정규시간 동안의 생산용량 n fp, Fp • Q: 수익을 최대화하는 quota

  21. RT OT Tn+1 Tn Un Tn+1 Overtime Un Production Q Rn Tn Inventory Sn Inventory level 기말재고 + Sn+1= (Q – Dn) 정규작업시간 후의 재고 Rn = min(Sn+Yn, Q) 기초재고 + Sn= (Q – Dn-1)

  22. Profit maximization Profit n = Revenue - Regular cost - Overtime cost – Holding cost = p*min(Q, Dn) – CR*(Q-Sn) – K*Pr{Sn+Yn<Q} – C*(Q-Rn)–h*(Q-Dn-1)+ 판매수량 정규작업량 잔업 확률 잔업량 재고량 Long-term average profit per period Max G(Q) = (p-CR)E[min(Q, D)] – K*Pr{(Q-D)+ +Y<Q} - C*(Q - min[(Q - D)+ + Y , Q]) -hE(Q-D)+ Cost minimization Min W(Q) = p1E(D-Q)+ + hE(Q-D)+ + K*Pr{(Q-D)+ +Y<Q} + C*[Q - min[(Q - D)+ + Y , Q])  p1=(p-CR) Min W(Q)= - g(Q)+(p-CR)ED Marginal profit

  23. First-order condition dW(Q)/dQ= 0 Second-order condition d2W(Q)/dQ2= 0 >0  Globally optimal Q* • Production • Demand f’p(x)>0 D=D+DX Unimodal Normal D 0 LP MP

  24. Theorem 1 Q* is nonincreasing in K, h, c,non-decreasing in p 잔업/ 재고비용증가 Q 감소,가격상승Q 증가 Higher Price Supplier Customer Customer Supplier Q1 Q* Q1 Q* Q1=Q* Q1>Q*

  25. Theorem 2 • Q*< D : K, h are is high enough D increases higher holding cost Q* decrease • Q*> D : marginal profit p1 is high enough D increasesneed more inventory as hedge Increase in D increase in the Q* Increase in Y increase in the Q* when K=0 Theorem 3 D=D+DX If Q*< D, Q* is non-increasing in D If Q*> D, Q* is non-decreasing in D

  26. Alternative • The quota level desired by a customer How much additional capacity is required • m products on different, in compatible lines Theorem 4 Cv=D/D Q* is non-decreasing in D for a fixed Cv

  27. Numerical example • Weekly demand from a manufacturer • D=D+DX= 100 + 20X • Y = P+PY= 125 + 10y • P1=1,k=75, c=0.4, h=0.05 • Q*=109.3 68% on time delivery P=130 ¼ D P=6 • Q*=106.4 fewer Q* theorem 3 • 90% on time delivery • Q*=115.3 • 94% on time delivery

  28. Conclusion • Most of problems • Demand uncertainty >>production capacity uncertainty • Cost of demand uncertainty • Decreasing uncertainty can lead to benefits to both

More Related