AO SODRUGESTVO – T Kharkiv , Ukraine. Participant #3. AO SODRUGESTVO-T. and CENTRE FOR ENERGY SAVING PROCESS INTEGRATION (CESPI) at NATIONAL TECHNICAL UNIVERSITY ”KHARKIV POLITECHNICAL INSTITUTE” (NTU ”KhPI”). AO SODRUGESTVO-T. Founded 1991 at NTU KhPI
E N D
AOSODRUGESTVO– TKharkiv, Ukraine Participant #3
AO SODRUGESTVO-T and CENTRE FOR ENERGY SAVING PROCESS INTEGRATION (CESPI) at NATIONAL TECHNICAL UNIVERSITY ”KHARKIV POLITECHNICAL INSTITUTE” (NTU ”KhPI”)
AO SODRUGESTVO-T • Founded 1991 at NTU KhPI • Objective: To implement research results into industry of Ukraine • Staff: 50, including 3 professors, 10 PhD
Affiliated company in RussiaZAO TEPLOKOMPLECT,BELGOROD • Founded 1993 • Staff: 15 • Facilities: workshop for PHE heating modules production
Main interests • The integration and optimisation of energy consuming industrial processes • Research and development of Plate Heat Exchangers with enhanced Heat and Mass transfer • Development and production of Control Devices for DH applications • Software development • Developments in education. Dissemination of knowledge and know-how • Production and installation of modern Energy Saving Equipment (PHE, Heating Modules, Electronic Regulators and Control Devices)
International projects 1993-2006 • British Council Link UMIST-NTU KhPI Project • INTAS 2017 • NATO HTECH.LG 941000 • TACIS/EUK 9407/06 • REAP UKR/395/41/0007 • INCO-COPERNICUS IC15-CT98-0506 • SYNERGY C.4.1041/D/99-0.28 • INCO-COPERNICUS-2 ICPF-5-1999-A2 PR01 • TEMPUS-TACIS CD JEP-21242-00 • SHERHPA COL-CT-2004-500229
Track record • The quarterly magazine ”Integrated Technologies and Energy Saving” founded in 1999 • Annual Ukraine conference ” Integrated Energy Saving Processes”, in May 2000, 2001, …. 2010… • The course ”Fundamentals of Heat Processes integration” is developed and Guidebook published jointly with UMIST experts • The course “Plate heat exchangers in industry” • 8 books published • 120 papers • Participation at 18 International conferences
Implementation in Ukrainian Industry • Production of Plate Heat Exchangers with Alfa Laval (Sweden) in Kharkiv • Production of Regulators and Control devices for DH applications • Production of energy saving heating modules for Ukrainian district heating • More than 3 000 PHE installed in 18 regions of Ukraine • About 1000 heating modules working around Ukraine, in Kyiv alone more than 300
Implementation in Ukrainian Industry • About 1000 temperature regulators produced and installed • Pinch Analysis and retrofit project of the crude oil unit at Kremenchug refinery • The heat integration in process of producing the pitch from coal tar and retrofit project for Zaporozhie and Avdeevka Coke-Oven Plants. • Pinch Analysis and retrofit project of the dioxide titanium production at “SumyKhimProm ” • Pinch Analysis and retrofit project of Kherson refinery
Implementation in Russian Industry • Production of energy saving heating modules for Russian district heating in Belgorod • More than 1000 PHE and about 400 heating modules installed in 15 regions of Russia: Moscow, Belgorod, Voronezh, Rostov, Krasnodar, Bryansk, Kursk, Lipetsk, Ryazan and others • 2000/2001 year 50 modules produced for World Bank Project in Ryazan • Analysis of Energy Saving potential, electronic regulators and PHE supply for Sugar Factories in Belgorod, Voronezh and Krasnodar regions
Lesi Ukraynky avenue, Kyiv Apartment building Two heat modules TS 501-rtM6 series installed for two-zone heating system hot water supply system
€/y 1996 – Closingof opened hot water supply system, Slavyanoserbsk250 000 1997 – Retrofit of central heat supply station, Dnepropetrovsk120 000 1999 – Retrofit of Children Hospital No9, Kyiv 40 000 2001 – 52 heat stations, Kyiv80 000 2002 – 32 heat stations, Ryazan, Russia40 000 2003 – Retrofit of СаСl2production, Sterlitamak, Russia 100 000 Cost savings
€/y 2003г. – Implementation of plate heat exchangers to alcohol production, Borshyev 70 000 2004 г. – Implementation of plate heat exchangers to starch-molasses production, Verhnedneprovsk 40 000 1995 – 2005 г. – Retrofit heat supply and hot water systems with use of 1200 heat substations 2400 000 1995 – 2005 г. – Retrofit heat supply and hot water systems with use of 2000 plate heat exchangers2 000 000 Total Economy (approximately) 5140 000 Cost savings