REPUBLIC OF SERBIA MINISTRY OF FINANCE GENERAL DIRECTORATE OF CUSTOMS

REPUBLIC OF SERBIA MINISTRY OF FINANCE GENERAL DIRECTORATE OF CUSTOMS. Time measurement projects. Brussels, 10 July 2014. Vidanovi ć Gordana. SERBIA. General Directorate of Customs 1 5 customs offices 7 2 customs posts 70 border crossing points. Two time measurement project s.

leroy
Download Presentation

REPUBLIC OF SERBIA MINISTRY OF FINANCE GENERAL DIRECTORATE OF CUSTOMS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REPUBLIC OF SERBIAMINISTRY OF FINANCEGENERAL DIRECTORATE OF CUSTOMS Time measurementprojects Brussels, 10 July 2014 Vidanović Gordana

  2. SERBIA

  3. General Directorate of Customs • 15customs offices • 72 customs posts • 70 border crossing points

  4. Two time measurementprojects • Trade and Transport Facilitation in South East Europe (TTFSE) • World Bank credit (value approximately 6 million dollars) • Implemented between 2002 and 2007 • Project objectives • Reduce non-customs costs to trade • Reducelevels of smuggling and corruption at border crossing points • Time measurement project – implementationfrom 2003 • Laufzettel– EU initiative • Implemented in 2006

  5. Differencesbetween the projects

  6. Trade and Transport Facilitation in South East Europe - TTFSE • In 2002, all the pilot sites (PS’s) weredesignated: • 4 border crossing points (BCP’s) and 1 inland terminal • In 2003, pilot teams (PT’s) were set up at all the PS’s • The PT members are representatives of: • - customs,- border police, - veterinary inspection agency, and - phytosanitary inspection agency

  7. Pan europEAN transport CORRIDORS HORGOŠ BATROVCI BELGRADE GRADINA PREŠEVO

  8. TTFSE 4 CUSTOMS OFFICER POLICE DOUANE 3 2 1 SERBIA

  9. TTFSE • Indicators at BCP’s1. Average entry time 2. Average exit time 3. % examinations4. % irregularitiesdetected • Indicators at inlandterminal1. Average clearance time 2. Number of trucks cleared in <15 min. 3. % examinations4. % irregularitiesdetected

  10. HORGOŠ

  11. BATROVCI

  12. GRADINA

  13. PREŠEVO

  14. Inland terminal Belgrade

  15. LAUFZETTEL • The projectwasimplemented in cooperationwith the Customs Administration of the FYROM • Project carried out in October2006 • Time measurementperformed for 7 days • The projectimplementation team was made up of staff from the General Directorates of Customs of Serbia and the FYROM • 2 indicators (average entry time and average exit time)

  16. LAUFZETTEL CUSTOMS POLICE POLICE CUSTOMS 1 2 3 4 FYROM SERBIA

  17. LAUFZETTEL Exit time

  18. IMPACTS 1. Close cooperationbetween the border agencies at the local level, particularlythanks to the local pilot teams set up in Serbia, and close cooperationwith the Customs administration of the FYROM. Customs has taken over the control of radiation measurement at the border from the Environmental Inspection Agency. The veterinary and phytosanitary inspection agencies have taken over the control of animals and rare plants from the Environmental Inspection Agency.

  19. Thankyou for yourattention! Vidanović Gordana vidanovicg@carina.rs