Republic of Serbia Ministry of construction and urbanism. MR Miodrag Jocic, B.C.I. State secretary. The Balkans Forum for infrastructure Rome, 13 th November 2012. Motorway network in R. Se r bia. International corridor X. Motorway E-75 (north) section : BC Horgoš – Novi Sad
E N D
Republic of Serbia Ministry of construction and urbanism MRMiodrag Jocic, B.C.I. State secretary The Balkans Forum for infrastructure Rome, 13th November 2012.
Motorway E-75 (north) section: BC Horgoš – Novi Sad section: BC Kelebija – interchangeSubotica-South BC Kelebija-interchange Subotica-South BC Horgoš-Novi Sad
Motorway E-75 (south) section: Grabovnica - Levosoje Gornje Polje - Caričina Dolina Caričina Dolina - Vladičin Han Vladičin Han - Donji Neradovac Donji Neradovac - Srpska kuća Srpska kuća - Levosoje
Motorway E-80 section: Prosek – Dimitrovgrad Prosek - Crvena reka Crvena Reka - Čiflik Čiflik-Staničenje Staničenje - Pirot istok Pirot istok -Sukovo Sukovo-Dimitrovgrad Dimitrovgrad bypass
Motorway E-763 section: Belgrade - Požega Belgrade - Obrenovac Obrenovac - Ub Ub - Lajkovac Lajkovac - Ljig Donji Banjani – Ljig Boljkovci – Takovo Takovo – Preljina Preljina - Prijevor Prijevor - Lučani Lučani – Požega
Motorway E-761 section: Pojate - Preljina Pojate - Adrani Adrani - Mrčajevci Mrčajevci - Preljina
Serbian RailwaysPublic company • 3800 кmof track • 1535 кmelectrifiedtrack • 827 кm on Corridor X • 12 mill. tons/year • 15 mill.passengers/year
Serbian RailwaysPublic company Russian loan First component: Belgrade-Bar total reconstruction 200 million euro Second component: Belgrade-Pancevo Construction of second track 55 million euro Third component: Corridor 10 (112 km), total reconstruction 60 million euro Forth component: Valjevo-Loznica completion of construction 280 million euro EBRD loan material for Corridor 10 (112 km), total reconstruction 35 million euro EBRD loan rolling stock: Multi-system locomotives tender is ongoing 65 million euro EBRD loan electric trains 100 million euro EIB loan total reconstruction of section Stara Pazova-Novi Sad (45km) 200 million euro and from our budget 140 million euro