Improvements to the Airport Business Suite. A decision support system for airport development, planning and operations. Overview. The airport business suite consists of three layers: Graphical User Interface (GUI) Computational models Common Data-layer Currently mostly used by students

Download Presentation

Improvements to the Airport Business Suite

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Improvements to the Airport Business Suite A decision support system for airport development, planning and operations

  2. Overview • The airport business suite consists of three layers: • Graphical User Interface (GUI) • Computational models • Common Data-layer • Currently mostly used by students • Course ‘Strategic Airport Planning’ • Fourth year exercises • Ideal testing ground

  3. Models in the original ABS Model 4/5 Model 2 Model 1

  4. Models in the original ABS • Model 1: Demand forecasting • Passenger demand based on city pairs • Model 2: Airport capacity and delay • Airside capacity: FAA airfield capacity model • Delay: Network of queuing models • Landside: IATA terminal capacity model • Model 4/5: Economics • Turnover, operational costs and investments

  5. Improvements • Model 1 replaced by flight schedule generator • Aircraft based instead of passenger based • More versatile • Easier to use • More possible growth scenario’s (de-peak / peak) • Model 4/5 removed • Results proved unreliable • Replaced with some data output for manual calculations

  6. Graphical User Interface (GUI) • Model 3 is actually the GUI • The GUI allows the users to interact with the models and the data. • Running peak-day cases • Running yearly cases (collection of peakday cases) • Editing parameters • Creating new flight schedules • Creating input for INM

  7. Amsterdam Airport Schiphol (AMS) • Exists from 1916 • In 2003: • KLM Main hub • 4th largest airport in Europe (#pax) • 9th largest airport worldwide (#pax) • 393 000 aircraft movements • 39.9 Million passengers • 1.3 Million tons of freight

  8. AMS: Runway Expansion € 420 000 000 € 860 000 000 € 1 280 000 000

  9. AMS: 2003, 5P Base case (actual flight schedule used)

  10. AMS: 2010, 5P 2003-2010: 6.85% peak-wise yearly growth

  11. AMS: 2020, 5P 2010-2020: 2.96% peak-wise yearly growth

  12. AMS: 2020, 5P 2010-2020: 2.96% normal yearly growth

  13. AMS: 2020, 6P 2010-2020: 2.96% normal yearly growth

  14. AMS: 2020, 6PK 2010-2020: 2.96% normal yearly growth

  15. AMS: 2020 Storm Arrival Capacity 6P 6PK

  16. Conclusions and Recommendations • AMS • 6PK seems the preferred choice for 2020 • ABS • Able to compute airport performance indicators • Lot of manual input • A lot of work comparing output • Improvements will be used mostly for HARMOS