ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market

ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting BEB, E.ON GT, GTS and WINGAS TRANSPORT Paris, 11.05.2007. Contents. Status quo TSOs answers/proposals.

Download Presentation

ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting BEB, E.ON GT, GTS and WINGAS TRANSPORT Paris, 11.05.2007

  2. Contents • Status quo • TSOs answers/proposals

  3. Situation Bunde/Oude Statenzijl (H-Gas)Direction Netherlands-Germany • Direction from Netherlands is the historical flow direction • The upstream capacity on the Dutch side can be allocated in different ways to the exits • Joint scrubber leads to cross-influences of exit capacities to E.ON GT and Wingas Transport BEB GTS E.ON GT WINGAS TR. Netherlands Germany

  4. Situation Bunde/Oude Statenzijl (H-Gas)Direction Germany - Netherlands • Demand of capacity in the East-West direction developed long after demand for capacities in the West-East direction • Expansion projects were initiated by TSOs • Because of the specific physical grid situations, capacity increases were accomplished earlier on the German side BEB GTS E.ON GT WINGAS TR. Netherlands Germany

  5. Status quo:Answers 5.1 and 5.2 1) Maximum implementation lead time: 10 days 2) More than 3 months and less one year: 3 months 3) New cooperation agreement

  6. Status quo:Answers 5.3 and 5.4

  7. Status quo:Answers 6.2 1) First committed first served is offered in combination with online booking

  8. Status quo:Answers 6.3

  9. Contents • Status quo • TSOs answers/proposals

  10. Implementation Goal 1:BNetzA / DTe Proposals Submit missing data on technical capacity, subscription, flows for (2004), 2005, 2006 • Except for confidential data in some months • Data only available from 10/2005 • Percentages refer to net flow • Except for months Oct-Dec 2007 because of change of calculation model

  11. Implementation Goal 1:BNetzA / DTe Proposals Explain low utilisation and temporal over-utilisation • Interpretion of question was different between TSOs, e.g. some took net flow and some took contractual allocated flow • High utilisation rates in BEB answer because of netting effects and usage of allocated capacities • Wingas Transport utilisation rates are within range • Low utilisation rates from E.ON GT grid to GTS grid because of lower GTS entry capacity compared to E.ON GT exit capacity • Temporarily higher gas flows possible on operational level dependend on actual flow situation in the GTS grid

  12. Implementation Goal 1:BNetzA / DTe Proposals Identify possible ways to maximise capacity • UIOLI mechanisms are in place • Further facilitation of secondary market via day ahead capacity platform under development • Operators are open for discussion of new proposals

  13. Implementation Goal 1:BNetzA / DTe Proposals Strictly enforce UIOLI • Detailed legal requirements on long term UIOLI in Germany and in the Netherlands • Such UIOLI mechanisms have been implemented in the respective network codes Buy-back capacities • Buy-back mechanisms better to be solved via secondary capacity market

  14. Implementation Goal 1:BNetzA / DTe Proposals Ensure that capacity trading platforms are running and interlinked • Capacity trading platforms are running in the Netherlands and in Germany • Relation to day ahead capacity pilot ?

  15. Implementation Goal 2:BNetzA / DTe Proposals Comply with all transparency requirements • TSOs would like to be informed about any perceived non-compliance with existing transparency obligations • In case of non-compliance with existing transparency obligations, TSOs will endeavour to comply as soon as possible • Additional transparency requirements should be discussed and if agreed upon aligned with other work streams, i.e. in the day ahead capacity pilot

  16. Implementation Goal 3:BNetzA / DTe Proposals Planned capacity increase • E.ON GT exit capacity increase to 1.5 Mio m³/h in 2007 • GTS entry capacity increase by 3 Mio m³/h in 2010 CAM for new capacities • The capacity allocation methods currently applied by TSOs are in line with the applicable national legal obligations • Possible change requirements to be discussed

  17. Implementation Goal 4:BNetzA / DTe Proposals Identify scope and limits for establishing a harmonised/bundled framework • GTE is currently conducting a study on harmonisation of capacity products, input from regional market is welcome • Bundled entry and exit capacities will be treated in day ahead capacity pilot

  18. Implementation Goal 4:BNetzA / DTe Proposals Coordinate with the goal of facilitating booking procedures, especially with respect to spot markets • Learn from coordinated day ahead capacity pilot ?