40 likes | 128 Views
Panel Discussion: Proposed Changes to the ASO. Why do we need the Order?. Provides valuable guidance and structure Topically: Shielding policy, interlocks Depth: Safety Analysis 835 0 pages 420 IG 6 pages 830 IG 48 pages. What value does the Order bring?. Tool
E N D
Why do we need the Order? Provides valuable guidance and structure • Topically: • Shielding policy, interlocks • Depth: • Safety Analysis • 835 0 pages • 420 IG 6 pages • 830 IG 48 pages
What value does the Order bring? Tool • Meant to be used, not followed • Allows for standardized approach, but different outcomes • Risk analysis, USI, credited controls
Alternatives • The Order/Guide are the proper instruments • Any other alternative will: • Create gaps (835, 851, external) • Be excessive (830) • Ultimately, will not reduce burdens on DOE or contractors