40 likes | 116 Views
2009 RPC CAF experience. We did a very good exercise at the end of 2009 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/ Carillo /Cimmino/Lomidze/Tupputi/Trentadue
E N D
2009 RPC CAF experience We did a very good exercise at the end of 2009 • 2 shifters + 1 shift leader + Experts: • Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue • Mandate: run “quality/validation” by hands and fast feedback to P5 made by shifters+shift leader using “instructions” • PA, DQM online/offline and Noise • DCS offline ? Configuration ? Masked strips ? • “basic” analysis to produce plots and result • Good results but: tools and instructions were still under development, too many tools to use and not many experts in shift Pigi Paolucci
2009 RPC CAF organization Analysis Salvatore Orso Haiyun Georgi Go ………… • For the 2010 manpower I would like to simplify the present schema and maximize the CAF efficiency and results CAF DQM Anna PA ? Noise Silvia WBM Raffaello Reco Camilo Shifter Pigi Paolucci
2010 CAF proposal • Mandate: run “quality/validation” and fast feedback to P5 • Improve Run Quality certification: • Merging tools (DQM and PA) and include more from Reco if we need • Stable procedure for the noise and DCS info ! • Have more expert at CAF (training) • Do we need shifter ? In the more wide sense Pigi Paolucci
2010 CAF organization • Merging Phase: • Prompt Analysis in DQM (David was supposed to include the output list) • DCS/XDAQ (ORCOF data) in DQM (Anna + ?) • ORCOF data production (?) • WBM: Raffaello CAF Analysis DPG DQM PA ? Noise Silvia WBM Raffaello Reco Expert Runquality (Anna, Camillo, David, Silvia) Pigi Paolucci