Outlook to FP7 Call3 in Energy Siegfried Loicht Division for European and International Programmes (EIP) Austrian Research Promotion Agency (FFG)
Draft Outlook Energy Work Programme 2009 • Status of Work-Programme: • DRAFT (latest version 23/04/08) • to be discussed in Programme Committee and EC • Estimated publication date: • Expected September 2008 • Approach for 2009: • Effort in this work programme focuses on technologies identified in the SET-Plan as key challenges for the next 10 years. This means that second generation biofuels (in particular biorefineries), CO2 capture and storage, solar energy, offshore wind and smart electricity grids have an important part.
Draft Specifics of Work Programme 2009 • SME relevant research fields: • Efficiency and material issues for thin-film photovoltaics • Biowaste as feedstock for 2nd generation • Sustainable Biorefineries • High density /rapid release energy storage International cooperation in topics (e.g.): • Efficiency and material issues for thin-film photovoltaics • Biowaste as feedstock for 2nd generation • Innovative capture techniques • Safe and reliable geological storage of CO2 • Towards an infrastructure for CO2 transport and storage • Topics with cross thematic approaches: • Biorefineries, wind/ocean energy conversion • non-food aquatic biomass feedstock for 2nd generation biofuels
Indicative To be confirmed Summary of budget allocation in the Work Programme 2009 [1] Any savings from previous activities launched under the previous RTD calls in the Energy work programme would be assigned to call FP7-2009-1.
Draft Overview of FP7-ENERGY-2009-1 • Two stage procedure
Draft Overview of FP7-ENERGY-2009-2 • Single stage procedure
Draft Overview of FP7-2009-BIOREFINERY • Joint call between Energy, NMP, Environment, KBBE • Total budget: ~ 57 million Euro • Two stage procedure
Lessons learned from Call1Frequent weaknesses of proposals (1/3) Source: European Commission • Scientific and technical quality • Limited innovation • Not beyond commercial practices • Not entirely addressing the topic priorities • Insufficient demonstration part • Insufficient quality of the concept and work plan
Lessons learned from Call1Frequent weaknesses of proposals (2/3) Source: European Commission • Implementation • Unclear complementarity of consortium partners • Unclear experience of some partners • Insufficiently justified presence of partners • Inappropriate management structure • Too large consortia (keep consortia to minimum size necessary) • Inappropriate resources allocation / justification
Lessons learned from Call1Frequent weaknesses of proposals (3/3) Source: European Commission • Impact • Limited monitoring and dissemination foreseen • No significant impact • No significant replication potential • No significant European added value • Lack of involvement of industrial partners • General • Unstructured text, difficult to read • Unclear /incomplete information
Thank you for your attention! Siegfried Loicht FFG/European and International Programmes +43-(0)5-7755-4304 siegfried.loicht@ffg.at