121 likes | 274 Views
Rail Transit Construction Project Management. EURASIARAIL FAIR 02-05 MARCH 2011 ANKARA. By Galip Sukaya. Project Development. Concept Political Support EIS Financing. Finance – Page I. There are many Institutions Export Import Banks EBRD OPIC KfW EIB IFC Required Documentation
E N D
Rail Transit Construction Project Management EURASIARAIL FAIR02-05 MARCH 2011 ANKARA By GalipSukaya
Project Development Concept Political Support EIS Financing
Finance – Page I There are many Institutions • Export Import Banks • EBRD • OPIC • KfW • EIB • IFC Required Documentation Application Process
Finance – Page II Required Documentation • Feasibility Report • Financial Capability • EIS/EIR • Application Forms Application Process
Preparation of Contract Documents Design Criteria Conceptual Design 30%, 60%, 90%, 100% Design Specifications General and Special Conditions Estimate
Construction Management Scope Schedule Budget
Start Up Testing Safety Certification Revenue Service