HiRadMat safety preparation. Follow-up meeting 24 /06/2011. Processes. See Marion’s talk. Alarms. Instruction meeting f or CCC operators on Monday June 20th https:// edms.cern.ch/document/1149524/1 List of alarms consolidated Lot of them not yet operational
E N D
HiRadMat safety preparation Follow-up meeting 24/06/2011
Processes • SeeMarion’s talk
Alarms • Instruction meeting for CCC operators on MondayJune 20th • https://edms.cern.ch/document/1149524/1 • List of alarmsconsolidated • Lot of them not yetoperational • Operationalprocedure in beingwritten
Beamcommissioninglowintensity • Operationalprocedureapproved • https://edms.cern.ch/document/1149525/2 • Dry runoutcome • https://edms.cern.ch/document/1149523/1 • Additional DSO tests on Tuesday • First shot hit the dump !
B.846 works during next TS • Met L. Colly • 2 x 2 lifting points • Load specification by FB • Will be installed during next TS
Evacuation hardware • Met GS-ASE • Cable extension duringnext TS • Evacuation buttons and sirenswillbeinstalledduring the August TS.
Safety file descriptive part • Still in work.