150 likes | 303 Views
An Area West presentation. Peter Gerring. Alliancing with Network Rail Patricroft Station. 25/04/2012. Alliancing Day. Works underway Compound Subway Platform. Alliancing Day. Before and after Compound Graffiti. Alliancing Day. Before and after Graffiti Pathway litter.
E N D
An Area West presentation Peter Gerring Alliancing with Network RailPatricroft Station 25/04/2012
Alliancing Day Works underway Compound Subway Platform
Alliancing Day Before and after Compound Graffiti
Alliancing Day Before and after Graffiti Pathway litter
Alliancing Day Before, during and after The road bridge
Alliancing Day Before and after Pathway vegetation
Alliancing Day The team together – Northern and Network Rail alliancing
An Area West presentation Peter Gerring The SQ AuditPatricroft Station 04/05/2012
Subsequent Audit Failures Sign defaced Graffiti removal patch painting Hole in wall
Subsequent Audit Failures No Smoking Sign torn away Graffiti on copping stones and platform surface
Subsequent Audit Failures Shelter dirt in corners Shelter dust under seat Shelter dust on seat Shelter roof damaged
Subsequent Audit Failures BT Phone missing Paint flaking on platform wall Wall surface crumbling with loose bricks Litter bag missing
Subsequent Audit Failures Seat rusty Urine patch underneath seat in shelter Cobwebs evident in shelter Flaking paint on steps up to platform
SQ Score SQ Score before Alliancing:72.5% SQ Score after Alliancing: XX.X%