2011 AND BEYOND

2011 AND BEYOND. IN 2010 MDM SAW REQUESTS FROM THE INDUSTRY FOR. Re-costing of old BFS’s Re-validating of CBE’s (control budget estimates) New study requests picked up dramatically: Scoping Studies – 11 PFS – 13 BFS - 19. IN 2011 MDM FORSEES. High commodity prices being sustained in:

liana
Download Presentation

2011 AND BEYOND

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2011 AND BEYOND

  2. IN 2010 MDM SAW REQUESTS FROMTHE INDUSTRY FOR • Re-costing of old BFS’s • Re-validating of CBE’s (control budget estimates) • New study requests picked up dramatically: • Scoping Studies – 11 • PFS – 13 • BFS - 19

  3. IN 2011 MDM FORSEES • High commodity prices being sustained in: • Gold; • Copper; • Uranium; • Iron ore; • REE’s • Coal • Resulting in: • Real project spend starting again; • Requests for fast track execution from clients to benefit from high prices.

  4. COUNTRIES/REGIONS GENERATING INTEREST IN AFRICA • North Africa – Morocco, Mauritania; • West Africa – Ghana, Côte d’Ivoire, Burkina Faso, Liberia, Sierra Leone, Mali, Senegal; • Central Africa – DRC, Zambia; • East Africa – Tanzania, Eritrea, Ethiopia, Uganda; • Southern Africa – Zimbabwe, Mozambique, Namibia, Botswana, South Africa (Limited)

  5. THE INDUSTRY CHALLENGE’S MDM FORESEES • In 6-9 months a significant skills shortage again • A move towards LSTK/EPC away from EPCM contracting in projects under US$ 100 million • Projects impacted by: • Supply lead times increasing again; • Project time lines/schedules increasing again; • Project costs increasing again; • Industry under pressure – déjà vu 2007/8.

  6. MDM ANTICIPATES • Significant new contract awards during 2011; • Margins should improve for engineering companies; • Need for efficient cost control, planning, project management, QA and QC; • To ensure projects remain ON TIME and ON BUDGET.

  7. WHO WE ARE • A process engineering and project management company whose technical team has a 23-year track record • Staffed by skilled professionals with experience in 32 countries, of which 20 were on the African continent • Africa Focused • Listed on the London Stock Exchange (AIM)

  8. WHAT WE’VE DONE • 63 Bankable feasibility studies • Over 96% of BFS went on to receive third party financing • Constructed 52 metallurgical plants • All producing above design capacity • Commodities • Gold Uranium • Base Metals Ferro Metals • PGM’s Industrial Minerals • Coal Diamonds

  9. WHAT DO WE DO • Project Evaluation through • Scoping Studies • Pre-Feasibility Studies • Bankable Feasibility Studies • Design - Metallurgical process development and specialised engineering and design of metallurgical plants • Construction - Construction and commissioning of plants and associated infrastructure • Project Management - Total Project Execution • Manage medium to large size mining projects on an international basis

  10. DOING IT SAFELY • Total commitment to safety • “ZERO HARM” attitude towards fatalities, LTI’s and recordable incidents • Managing H,S & E is a critical business activity

  11. Thank You MDM staff induction artwork The MDM team

More Related