1 / 45

Bureau of Public Transportation Transportation Strategy Board Presentation May 19, 2010

Bureau of Public Transportation Transportation Strategy Board Presentation May 19, 2010. James P. Redeker Bureau Chief, Public Transportation. 1. Bureau of Public Transportation. MISSION STATEMENT

libba
Download Presentation

Bureau of Public Transportation Transportation Strategy Board Presentation May 19, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bureau of Public TransportationTransportation Strategy BoardPresentationMay 19, 2010 James P. Redeker Bureau Chief, Public Transportation 1

  2. Bureau of Public Transportation MISSION STATEMENT The mission of the Bureau of Public Transportation is to develop, maintain, and operate a system that provides for the safe, efficient and sustainable movement of people and goods. 2

  3. Bureau of Public Transportation • STRATEGICOBJECTIVES • Maintain existing systems at a state of good repair and enhance system safety and security • Improve efficiency and effectiveness of transit service delivery • Expand services to capture a greater share of existing markets and address specific new markets 3

  4. Bureau of Public Transportation BUREAU PROFILE • Unique service delivery model in Connecticut • ~50% of ConnDOT annual operating budget • Key role of public transit on Connecticut economy, air quality, energy conservation, mobility 4

  5. Bureau of Public Transportation LARGE SERVICE ORGANIZATION Expenses and Subsidy • Bus and ADA • $189M in annual operating expenses; $135M CTDOT Subsidy • For Rail • $380M in annual operating expenses; $88M CTDOT Subsidy Ridership (annual) • Bus and ADA - 38,200,000 passenger trips • Rail trips – 37,700,000 passenger trips Ownership • 300 rail vehicles and 1000 buses and paratransit vehicles • New Haven Line (in CT) and 3 branch lines; 6 Freight lines 5

  6. Bureau of Public Transportation SYSTEM PROFILE 6

  7. Public Bus Services 7

  8. Statewide Bus System Profile • Total Bus Transit System • (CTTRANSIT, Express Bus, Transit Districts, ADA, Dial-a-Ride and Shuttle Services) • Annual Passenger Trips – 38,200,000 • Annual Revenues - $39,000,000 • Annual Subsidy and non-Subsidy Expenses - $189,000,000 • Total Annual Subsidy - $141,000,000 • CDOT Share of Annual Subsidy - $135,000,000 • Average Subsidy/Passenger - $3.52 • Subsidy/Passenger by Service Type • Urban -$3.09 • Express Bus - $3.83 • Rural - $7.63 • ADA Services - $28.35 8

  9. Commuter Rail Services • New Haven Line and three Branch Lines • 35 Stations • 37 Million Annual Trips • Shore Line East • 8 Stations • 560,000 Annual Trips 9

  10. Rail Passenger System Profile • New Haven Line • Weekday Trains – 289 • Saturday-178 trains / Sunday-148 trains • Annual Passenger Trips - 37,000,000 • Annual Revenues - $253,000,000 • Annual Expenses - $360,000,000 • Total Annual Subsidy - $107,000,000 • CDOT Share of Annual Subsidy - $70,400,000 • Subsidy/Passenger - $1.90 • Shore Line East • Weekday Trains -23 (Monday-Thursday), 25 Friday • Saturday 16 trains / Sunday 16 trains • Annual Passenger Trips – 590,000 • Annual Revenues - $2,200,000 • Annual Expenses - $19,900,000 • Total Annual Subsidy - $17,700,000 • Subsidy/Passenger - $30.00 10

  11. Rail Freight Service 11

  12. Rail Freight System Profile • Over 50,000 carloads (four million tons) originate or terminate annually in Connecticut • Eight Rail Freight Carriers in Connecticut • ConnDOT’s Rail Freight Initiatives • Gross Receipts Tax Exemption Program • Rail Preservation and Improvement Program • Relay track materials from passenger lines • Acquisition of abandoned rights of way 12

  13. Bureau of Public Transportation FUNDING THE SYSTEM 13

  14. Bureau of Public Transportation FUNDING SOURCES • Annual Federal Transit Administration (FTA) Formula Funds • State provides the non-federal share for most rail and bus capital improvements • Annual State Bond Authorization • Special Authorizations • Other funding sources (e.g., FRA, ARRA) 14

  15. ARRA – Economic Stimulus(Total for Bus and Rail Transit = $152M) BUS • Statewide Bus Replacement Procurement Program (purchase includes up to 106 Hybrid buses) - $70M • Norwalk Transit District Pulse Point Safety and Security Improvements - $1.5M • Windham Transit District Bus Storage Canopies - $270K • Statewide Park and Ride Lot Improvements - $2M • Bus Engine Repowering - Greater Bridgeport Transit - $2.8M 15

  16. ARRA – Economic Stimulus(Total for Bus and Rail Transit = $152M) RAIL • Danbury Branch Signalization and Centralized Traffic Control (CTC) - $31M • New Haven Yard Component Change-Out (CCO) Maintenance Shop for new M8 rail cars - $30M • New Haven Line (NHL) Station Improvements - $10M • Branford Station Parking Lot - $5M 16

  17. Bureau Capital Issues • Annual Public Transportation Capital Program • $140 M to $160 M per fiscal year • State: $40M Bonding • Federal: Grown to $100 MM in Formula Funds • Federal Discretionary Varies Year-to-Year • An additional $1.2 Billion is programmed over the next 10 years - based on forecasted availability, not needs • Additional federal funding likely to be limited • Use of CMAQ funds (”flexing”) 17

  18. Bureau of Public Transportation CAPITAL NEEDS 18

  19. Bureau of Public TransportationMajor Capital Improvements • New Britain-Hartford Busway • CTTRANSIT Fleet Replacement • CTTRANSIT New Haven Division Maintenance Facility • M-8 Rail Car Procurement • New Haven Maintenance Facility Complex • New Haven Line Catenary Replacement • Railroad Movable Bridge Rehabilitation and Replacement 19

  20. Bureau of Public Transportation CAPITAL NEEDS BUS 20

  21. Capital Issues:Bus Rolling Stock Fleet Replacements 1000+ vehicles; 600+ full-size buses 1/4 already overdue for replacement Cost: $200 million - just for buses Timeliness of replacement based on availability of funds New and Expanded Services Job Access; Commuter Connections; TSB Services; Service Initiative Replacement of lost seating capacity 21

  22. Capital Issues:Bus Facilities New and Updated Facilities $150 million for New Haven; Waterbury; Needs in Torrington, Windham, Norwalk (expansion), SEAT 22

  23. Bus Capital Issues:New Services and Gaps Amenities - ITS; Shelters New Technologies Radios/GPS/AVL Fareboxes/Smart Cards Clean Fuels and Environmental Quality Bus Rapid Transit A new style of service New Britain-Hartford BRT in Final Design Route 1 BRT Norwalk to Stamford – in Planning Stage 23

  24. Joint study: ConnDOT, CRCOG, CCRPA, Towns I-84 Corridor West of Hartford including Arterial Roadways, Neighborhoods, Rail Lines Alternatives Studied Commuter Rail Light Rail Bus Rapid Transit High-Occupancy Vehicle Lanes Highway Widening New Britain – Hartford Busway Major Investment Study (July 1999) 24 24

  25. Busway -- Key Project Elements:Travel Time Savings/ Quality of Service Travel Time Savings and Reliability - Separate guideway – “Like Rail” Flexibility - Different service styles (shuttle, collector, express, feeder); Ease of Adding New Services and Extensions One-seat ride Convenience – Improved Frequency, Level Boarding Quality of Service Stations with amenities ITS – Intelligent Transportation Systems Real-time passenger information Signal Preference CCTV Proof-of-Payment Fare Collection 25 25

  26. 26

  27. 27

  28. Bureau of Public Transportation CAPITAL NEEDS RAIL 28

  29. State Rail Plan • Plan horizon 2010-2030 • Current condition of rail system in Connecticut – passenger and freight • Recommend strategies for responsible system growth and interconnectivity • Identify constraints and needs • Enhance regional mobility 29

  30. Bureau of Public Transportation • Rolling Stock (both NHL and SLE) • M8 cars • 300 purchased with option for 80 additional cars 30

  31. M8 Electric Multiple Unit 31

  32. Bureau of Public Transportation • Infrastructure (New Haven Line in CT owned by CTDOT) (SLE cost sharing) • Track • Bridges • Signal (PTC) 32

  33. Saga Moveable Bridge 33

  34. Moveable Bridge Rehabilitation Program • Walk and Saga bridges $450M (includes catenary replacement) • Currently in design phase, $393M programmed for construction • Devon and Cos Cob bridges $1B • Currently in engineering, feasibility and economic analysis study • Construction funds not programmed 34

  35. Fairfield Metro Station 35

  36. West Haven Station 36

  37. New Haven – Harford – Springfield Montreal aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa • NYC – Boston (Inland Route) • NYC – New Haven • New Haven – Springfield • Springfield – Boston • NYC - MA - VT - Montreal • Knowledge Corridor proposal + Vermonter or Montrealer • NYC – New Haven • New Haven – Springfield • extensions north of Springfield • Greenfield, MA • Bellows Falls or White River Jct, VT • Montreal • Both depend on increased capacity for NHHS section. Boston Springfield NHHS project limits Hartford New Haven 37 NYC

  38. Bureau of Public Transportation STAFFING 38

  39. Bureau of Public Transportation Organization Chart 40

  40. Office of Transit & Ridesharing30 Employees 41

  41. Contract Services and Support Project Development Bus Capital Projects Marketing and Transportation Demand Management Community Advocacy Regulatory and Compliance Office of Transit & Ridesharing 42

  42. Office of Rail45 Employees 43

  43. Office of Rail – Rail Design and Construction • Office of Intermodal Design and Construction • Operations • Rail Equipment Maintenance • Infrastructure Maintenance • Property Administration/Control • Security • Regulatory and Compliance 44

  44. Bureau of Public Transportation CHALLENGES 45

  45. Challenges • Capital needs vs. resources 2010 - 2014 • $3.4B Need • $2.1B Projected • $1.2B Shortfall • Operating subsidy • $267M annual subsidy in 2010 • Inflation, service contract increases • System Expansion • Rail Yard/M8 • NHHS • Shore Line East • Busway • Bus service expansion/ADA growth • Service delivery • Staff resources, capabilities, succession 46

More Related