110 likes | 207 Views
+2.5 V 30 A. Controller. Controller. +4 V 65 A. +4 V 100 A. +4 V 100 A. 3.6 V 25 A. +5.8 V 3 A. TGC1 subrack organization. First 84 HP (19”) subrack Controller: 15 HP 6 HV distributors (54 chs): 36 HP 1 LV distributor (1 ch): 15 HP Free space in subrack: 18 HP 12 x 2 subracks.
E N D
+2.5 V 30 A Controller Controller +4 V 65 A +4 V 100 A +4 V 100 A • 3.6 V • 25 A +5.8 V 3 A TGC1 subrack organization First 84 HP (19”) subrack Controller: 15 HP 6 HV distributors (54 chs): 36 HP 1 LV distributor (1 ch): 15 HP Free space in subrack: 18 HP 12 x 2 subracks Second 84 HP (19”) subrack Controller: 15 HP 4 LV distributors (5 chs): 60 HP Free space in subrack: 9 HP 12 x 2 subracks
Controller Controller +4 V 100 A +4 V 65 A • 3.6 V • 25 A +5.8 V 3 A TGC2 – TGC3 subrack organization First 84 HP (19”) subrack Controller: 15 HP 5 HV distributors (45 chs): 30 HP 1 LV distributor (1 ch): 15 HP Free space in subrack: 28 HP 24 x 2 subracks Second 63 HP subrack Controller: 15 HP 2 LV distributors (3 chs): 30 HP Free space in subrack: 18 HP 24 x 2 subracks
Controller Controller +4 V 65 A +4 V 100 A • 3.6 V • 25 A +5.8 V 3 A TGC Small Wheel and TGC11 subrack organization First 84 HP (19”) subrack Controller: 15 HP 5 HV distributors (45 chs): 30 HP 2 LV distributors (3 chs): 30 HP Free space in subrack: 9 HP 1 x 2 subracks Second 84 HP (19”) subrack Controller: 15 HP 5 HV distributors (45 chs): 30 HP 1 LV distributor (1 ch): 15 HP Free space in subrack: 24 HP 1 x 2 subracks
Controller +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 1 1 1 1 1 1 1 1 1 1 1 1 MDT HV and LV subrack organization for Barrel – I solution First 84 HP (19”) subrack Controller: 15 HP 11 HV distributors (99 chs): 66 HP Free space in subrack: 3 HP 14 subracks (BIS.8 -> 1 HV ch) Second 84 HP (19”) subrack 12 LV distributors (12 chs): 84 HP 59 subracks Barrel 656 – BEE 32 + EIL.4 16 + EEx 60 = 700
Controller Controller +6 V +6 V +6 V +6 V 15 A 15 A 15 A 15 A 6 6 6 6 5 5 5 5 4 4 4 4 3 3 3 3 2 2 2 2 1 1 1 1 MDT HV and LV subrack organization for Barrel – II solution First 84 HP (19”) subrack Controller: 15 HP 11 HV distributors (99 chs): 66 HP Free space in subrack: 3 HP 14 subracks (BIS.8 -> 1 HV ch) Second 84 HP (19”) subrack Controller: 15 HP 4 LV distributors (24 chs): 60 HP Free space in crate: 9 HP 30 subracks Barrel 656 – BEE 32 + EIL.4 16 + EEx 60 = 700
Controller +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 1 1 1 1 1 1 1 1 1 1 1 1 MDT HV and LV subrack organization for Small Wheel and BEE- I solution First 84 HP (19”) subrack Controller: 15 HP 10 HV distributors (82 chs): 60 HP Free space in subrack: 9 HP 1 x 2 subracks Second 84 HP (19”) subrack 12 LV distributors (12 chs): 84 HP 5 x 2 subracks (1 x 2 with 1 ch) Small Wheel 64 + BEE 32 + EEL.special 2 = 98
Controller Controller +6 V +6 V +6 V +6 V 15 A 15 A 15 A 15 A 6 6 6 6 5 5 5 5 4 4 4 4 3 3 3 3 2 2 2 2 1 1 1 1 MDT HV and LV subrack organization for Small Wheel and BEE- II solution First 84 HP (19”) subrack Controller: 15 HP 10 HV distributors (82 chs): 60 HP Free space in subrack: 9 HP 1 x 2 subracks Second 84 HP (19”) subrack Controller: 15 HP 4 LV distributors (24 chs): 60 HP Free space in crate: 9 HP 3 x 2 subracks (1 x 2 with 1 ch) Small Wheel 64 + BEE 32 + EEL.special 2 = 98
Controller +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 1 1 1 1 1 1 1 1 1 1 MDT HV and LV subrack organization for Big Wheel - I solution First 63 HP subrack Controller: 15 HP 5 HV distributors (40 chs): 30 HP Free space in subrack: 18 HP 4 x 2 subracks (one every two octants) Second 84 HP (19”) subrack 10 LV distributors (10 chs): 84 HP 8 x 2 subracks (one every octant)
Controller Controller +6 V +6 V +6 V +6 V 15 A 15 A 15 A 15 A 6 6 6 6 5 5 5 5 4 4 4 4 3 3 3 3 2 2 2 2 1 1 1 1 MDT HV and LV subrack organization for Big Wheel - II solution 84 HP (19”) subrack Controller: 15 HP 3 HV distributors (20 chs): 18 HP 2 LV distributors (10 chs): 30 HP Free space in subrack: 21 HP 8 x 2 subracks (one each octant) OR 63 HP subrack Controller: 15 HP 3 HV distributors (20 chs): 18 HP 2 LV distributors (10 chs): 30 HP Free space in subrack: 0 HP 8 x 2 subracks (one each octant)
Controller +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V +6 V 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 15 A 1 1 1 1 1 1 1 1 1 1 1 1 MDT HV and LV subrack organization for EO Wheel - I solution First 63 HP subrack Controller: 15 HP 6 HV distributors (48 chs): 36 HP Free space in subrack: 12 HP 4 x 2 subracks (one every two octants) Second 84 HP (19”) subrack 12 LV distributors (12 chs): 84 HP 8 x 2 subracks (one every octant)
Controller Controller +6 V +6 V +6 V +6 V 15 A 15 A 15 A 15 A 6 6 6 6 5 5 5 5 4 4 4 4 3 3 3 3 2 2 2 2 1 1 1 1 MDT HV and LV subrack organization for EO Wheel - II solution 84 HP (19”) subrack Controller: 15 HP 3 HV distributors (24 chs): 18 HP 2 LV distributors (12 chs): 30 HP Free space in subrack: 21 HP 8 x 2 subracks (one each octant) OR 63 HP subrack Controller: 15 HP 3 HV distributors (24 chs): 18 HP 2 LV distributors (12 chs): 30 HP Free space in subrack: 0 HP 8 x 2 subracks (one each octant)