1 / 21

TileCal, Stato del rivelatore

TileCal, Stato del rivelatore. Stato dei lavori in corso: Commissioning/Installazione Test Beam Combinato Analisi Cosa succedera’ a breve Il 2005. Installazione. ½ Barrel e’ installato in UX15 in schedula. I tests meccanici sono terminati

lieu
Download Presentation

TileCal, Stato del rivelatore

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TileCal, Stato del rivelatore • Stato dei lavori in corso: • Commissioning/Installazione • Test Beam Combinato • Analisi • Cosa succedera’ a breve • Il 2005 Nino Del Prete

  2. Installazione ½ Barrel e’ installato in UX15 in schedula • I tests meccanici sono terminati • Il cilindro verra’ completato quando Lar sara’ installato (fine Nov. 2004). • Spostamento nella posizione finale quando i toroidi saranno installati (Agosto 2005) • Stiamo lavorando sul debugging e QC dei moduli e “servizi”. 26 April 2004 UX15 Nino Del Prete

  3. Installazione (2) • Shape del cilindro e’ quella teorica ( ±3 mm) • La pre-installazione di ECB e’ finita, ECA e’ molto avanzata (24 moduli) • L’elettronica di FE (drawers) e’ installata • I Low Voltages PS hanno una schedula un po’ marginale ma dovrebbero essere pronti ad Agosto 2005. • Cs (calibrazione) in preparazione, installato per Agosto 2005 Problemi: • Ci sono ritardi nell’installazione del Barrel dovuti al ritardo del Larg (2 mesi), potrebbero essere recuperati nel 2005 • Installazione di 6 moduli/sett e’ possibile -> 2 mesi “full speed” • La partecipazione al CTB continuera’ fino a fine Novembre • Qualche problema di interferenza geometrica tra rivelatori. • A causa del taglio delle ME abbiamo dovuto interrompere la nostra partecipazione all’installazione (4 mu invece dei 5 promessi) Nino Del Prete

  4. Test Beam Combinato (1) • Il CTB e’ stato (ed e’) un successo. • I problemi (molti) che sono stati incontrati (DAQ, elettronica, LV&HV...) sono stati risolti • Tutti i rivelatori hanno partecipato e sono acquisiti • Abbiamo molti dati, con tutti i rivelatori, da analizzare • Per molti giovani e’ stata la prima esperienza di un “quasi esperimento” • Per Pisa in particolare: • I nostri ragazzi si sono fatti onore prendendo molte responsabilita’ e iniziative • Monitor online • Temporizzazione dei moduli di TileCal • Identificazione dei mu in TileCal • Per un lungo periodo sono stati “esperti” nel software e DAQ affiancando gli esperti ufficiali Nino Del Prete

  5. Test Beam Combinato (2) Nino Del Prete

  6. Test Beam Combinato(3) (Martine) Up to now Lar calibration are not available, resolution is still poor. Intercalibration of calorimeters will be the next step. Nino Del Prete

  7. CTB, Risoluzione TileCal standalone (Martine) 150 GeV p beam TileCal resolution agrees with previous Test Beam calibrations. Resolution is poor due to the low statistics. Tile raw +MIP in Lar +MIP in Sci davati a TILE Etile (GeV) Nino Del Prete

  8. Test Beam Combinato, MDT-Tile Ebeam = 350 GeV, pions m N.O. MDT tubes above thresh. Etile (GeV) Etile (GeV) Nino Del Prete

  9. Test Beam Combinato Timing (Vivarelli) e’ stato fatto nel run 25 ns di Giugno. Buoni risultati, la risoluzione temporale di Tile e’ migliore di 1 ns. Identificazione dei m (Usai) in Tile (ROD), ancora in attesa di RODs con CPU. L’algoritmo e’ stato implementato nel monitor al LVL3 (EF) in Athena. e=80% EBEAM=180 GeV Tags m Tile Hits MDT ETILE (MeV) Nino Del Prete

  10. Monitor: Status of the project (C. Roda) • A first version of the complete chain is working at the Combined Test Beam • User Detector groups are Tilecal, MDT, RPC, Beam, Pixel, TRT • Hope to integrate more detectors during CBT (SCT, CSC, LVL1 calo trigger...) • Ongoing developments on:CMT package mantainence, referencehistograms, trigger selection, automatic, storing of histograms... • Export a strip down version to MobiDAQ system Monitoring Developers:P. Adragna, A. Dotti, R. Ferrari, C. Roda, W. Vandelli, F. Zema. DAQ support: M. Caprini, S. Kolos. Users: M. Alviggi, I. Boyko, M. Brinet, D. Dedovitch, M. Della Pietra, L. Santi & people from Monitoring Developers. Nino Del Prete

  11. Commands to the Core : rebinning, reset ... Monitoring at CTB - MDT Nino Del Prete

  12. Monitoring at CTB – Tile + Beam Nino Del Prete Back

  13. Monitor for MobiDAQ System (Dotti, Roda) MobiDAQ is a DAQ that is used for the QC and debugging of the modules installed in the Pit (up to 8 drawers); it uses preliminary cables(TTC, G-Link, CAN, Trigger, HV?). External PS Tilecal racks Mobi DAQ UX15 USA15 Nino Del Prete

  14. gnam monitor for MobiDAQ (Dotti) • The ATLAS DataFlow and Online software are used for the data acquisition (the raw data are in the ATLAS Format) • A small partition composed of two emu-RODs, ROB and ROS has been prepared • First tests have been carried out reading successfully 2 drawers • gnam low level monitoring package used for the Combined TB will also be used to check in real time the quality of the data for the drawers under tests. • A special library is under development to perform some basic tests (pedestal and charge injection) for data from drawers and ADCs Example histograms obtained on a MobiDAQ pedestal run (run number 1042) Nino Del Prete

  15. Milestones 2004 30/6/2004: Tile Monitor pronto per CTB: OK 31/7/2004: EBA pre-assemblato: OK 30/9/2004: TileMuId sui RODs: NO; la versione attuale dei ROD e’ troppo primitiva e non ha CPU, nessun software e’ stato ancora implementato. TileMuId in funzione nell’EF ed in Athena. 31/10/2004: EBA pronto per l’installazione: OK; EBA/EBC saranno custoditi in un angolo del Bld 185 (che verra’ usato dai mu) in attesa dell’installazione in UX15 (2005). 31/12/2004: Tile Barrel completamente installato in UX15: improbabile, il ritardo sull’installazione del Lar difficilmente sara’ recuperato. Nino Del Prete

  16. Molto lavoro sta andando avanti anche a Pisa • Simulazione del CTB (Lupi) • Simulazione G4 di TileCal (in ATLAS) (Lupi) • Validazione di G4 (Lupi, Dotti) • Identificazione dei mu in Tile, correzione per “energy loss” (Usai) • Analisi dati del TB combinato (tutti) • Studio della calibrazione dei jets (Roda, Vivarelli) • Analisi dei dati delle calibrazione (un articolo di sommario e’ in preparazione) (Roda, Vivarelli) • Analisi di Fisica (Z->bb, H->bb, HAbb->4b) (Cavasinni, Vivarelli) • Al CERN il TBC continuera’ fino a fine Novembre, assieme al lavoro di QC e debugging del rivelatore in UX15. Difficilmente, con le ME residue, potremo essere incisivi. Nino Del Prete

  17. WTile0,WTile1,WTile2 WEm2,WEm3 WEmB2,WEmB3 WHEC1,WHEC2,WHEC3,WHEC4 Calibrazione dei jet Metodo alla H1 : Calibrazione dei jet: si assegna un peso Wi dipendente dal deposito di energia nella cella ad ogni sample calorimetrico. Ogni peso è parametrizzato come I pesi sono ottenuti minimizzando la risoluzione: Nino Del Prete

  18. Analisi di Higgs MSSM H  bb(bb H/A  4b, Mh=500GeV) Le diverse curve corrispondono a diverse soglie in PT dei jet. Per l’analisi e’ essenziale poter fare la sottrazione affidabile del fondo attraverso le side bands. Fondo QCD preliminare Set: Pth1=150 GeV, Pth2=100 GeV(curva blu), Con 30 fb-1si ha S/B=2%, S/B=7.1 Rates LV1  2 KHz LVL2 3 b-tags0.01 Hz Nino Del Prete

  19. Cose da fare nel 2005 • Al CERN: • Completamento di Tile-Barrel in UX15 (7 mu per tecnici) • Monitor per MobiDAQ (Dotti, Roda) • QC e commissioning del Barrel (Dotti, Vivarelli, Usai) • Temporizzazione di Tile (Laser e cosmici) (Vivarelli) • Installazione EBC (EBA?) • Run di cosmici (2004-2005) • I tempi (schedula attuale): • BARREL: • Genn-Ago 2005 commissioning (on truck) • Ago 2005 posizionamento finale • Sett 2005-Genn 2006 cabling/testing/commissioning • EBC: • Giu-Ago 2005 installazione • Sett 2005-Genn 2006 cabling/testing/commissioning Nino Del Prete

  20. Scafolding for ID/calorimeter services installation with barrel at z=0-In current schedule calorimeter cabling to the detector: 15Aug-15 Oct 2005-After scafolding is removed to allow for muon chambers installationScaffoding has to be modified - should not block Fingers covers; - safe extensions for drawers extraction tool Nino Del Prete Back

  21. Cose da fare nel 2005 • A Pisa: • Analisi e simulazioni (continua il lavoro del 2004) • Simulazione G4 di TileCal (in ATLAS) (Lupi) • Continua lo studio su G4 (Lupi, Dotti, Roda) • Analisi dati del TB combinato (tutti): • Intercalibrazione calorimetri • Algoritmi ricostruzione energia adronica • Analisi dei dati delle calibrazione (un articolo di sommario e’ in preparazione) (Vivarelli, Roda) • Analisi di Fisica: abbiamo partecipato a studi su vari canali di Higgs, riteniamo che sia il momento di rilanciare questa attivita’ • Tests di laboratorio su due elementi attivi che possono rivelarsi critici a lunghi periodi: • PMT, Fibre • Questa attivita’ e’ importante per ATLAS ma anche per la formazione dei giovani ricercatori. Nino Del Prete