Cameron Cortright, Robert Yearwood, ShivanMizouri, Derek Rudik G2 TriGen Networking Solution
Building layout • Composed of a base floor with 3 hallways (200 meters along), center of the building is a hexagon (160 meters across) • Second floor is the same as the base floor minus a hallway.
Building network construction Explained • Fiber runs out of the networking room. • 4 pieces of fiber total. • 2 pieces of fiber travel to each hall A, and B • Once the fiber reaches the hall each piece goes into a transceiver to be turned to CAT 6 • A piece of CAT 6 feeds into an 8 port switch that feeds all of the offices in the hall • The second piece of CAT 6 goes into a 8 port switch that feeds the four labs (separate from the offices) • All computers in the labs and offices are fed with CAT 5.
Machine and machine totals • 8 Labs • Each containing • 12 Computers • 2 Printers • 32 Offices • Each containing • 10 Computers • 4 Printers • 6 Administration • Each Containing • 6 Computers • 2 Printers • Total Computers • 452 • Total Printers • 64 • Total Machines to be networked • 516
Budgeting • Total budget: • $250,000 • Total Spent: • 228,116.36 • Price list included in excel workbook
Hardware/software providers • www.tigerdirect.com • www.newegg.com • www.amazon.com