1 / 5

UK – quad module

UK – quad module. Experience with FE-I4 . UK groups relatively new to ATLAS pixel H ave 5 USBPix systems up and running now Glasgow, Edinburgh, Manchester, Liverpool, RAL Bare chip characterization performed Same procedure as with the IBL testbeam Low threshold noise dependence measured

lilike
Download Presentation

UK – quad module

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UK – quad module

  2. Experience with FE-I4 • UK groups relatively new to ATLAS pixel • Have 5 USBPix systems up and running now • Glasgow, Edinburgh, Manchester, Liverpool, RAL • Bare chip characterization performed • Same procedure as with the IBL testbeam • Low threshold noise dependence measured • Pulser DAC calibration • Near future on single chips • Sr-90/Am-241 testing of Micron planar and 3D to start soon • Environmental chamber + active cooling of sensors in the lab • Laser set-up to perform in pixel maps • X-ray source rate measurements?

  3. Quad Module items • Sensor • New quad wafer being processed at Micron • 6inch wafer • Available in range of thickness (150um to 250um) • 250um to start with • 5 quads, 8 singles per wafer • Quads have different guard ring designs • Baseline : IBL like – Active to cut edge : 450um, 6 guard rings • Conservative : 850-900um • Single GR : 450um Active to GR • Single GR : 300um Active to GR • 5 quads to be assembled from this sensor with VTT UBM • Trial of UBM deposited by Micron will take place after this on 4 quad sensors

  4. Quad module parts continued • ASICs • 2 UK wafers plus MPI wafer • First wafer expected before end of September • Is this still possible? • UBM and Flip-chip at VTT • Order placed • UBM mask for FE-I4 and sensor wafers in design • Flipping to take place in October at VTT

  5. Future • Exploring future work with VTT • Front side passivation – BCB/Parylenecoating • To be performed in near future on single chip modules to start with • If successful will attempt on quad module • Thin modules • Thin sensors (150um demonstrated at Micron) • Thin ROC – will require a supply of FE-I4 wafers • Start with single chip modules but go to quads once proven • TSVs • Single chip R&D program. • Looking for interested parties to contribute – CMS/ALICE other ATLAS groups

More Related