An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Defense Logistics Management System (DLMS)Introductory Training Module 3

  2. Course Structure • Module 1 - Introduction to the DLMS • Module 2 – Electronic Data Interchange (EDI) Basics • Module 3 - DLMS Implementation Strategy • Module 4 - ASC X12 EDI Definitions and Concepts • Module 5 - DLMS EDI • Module 5F - DLMS Financial • Module 5M – DLSS/DLMS Mapping • Module 6 – XML & Emerging Technologies Module 3 / Course Structure

  3. Module Structure Module 3 –DLMS Implementation Strategy • DLMS Migration Program Management Plan • DoD Corporate Services • Operating Concept • Configuration Management • Lessons Learned Module 3 / Course Structure

  4. Module 3 Objectives Students will gain basic understanding of: • The purpose and contents of the DLMS Migration Program Management Plan (PMP) • What corporate services are available to support implementation • The DLMS operating concept including critical translation and conversion processes • The essential elements of Component planning for DLMS implementation • How DLMS process changes are managed • Lessons learned during previous DLMS implementations Module 3 / Objectives

  5. DLMS Migration Program Management Plan (PMP) Module 3 / DLMS Program Management Plan

  6. DLMS Migration PMP is Largely About – “Cutting the Elephant Into Manageable Pieces” • Phased Migration: Build your strategy and schedule for • Evolution, not Revolution • By System • By Function • By Transaction Priority Grouping • By DLSS Transaction Family • By Individual Transaction • Include Process Reengineering Module 3 / DLMS Program Management Plan

  7. Table of Contents DLMS Migration Acceleration Program Management Plan (PMP) Introduction Program Benefits Successful Migrations 10 Steps to Success Cost Estimates DLSS (MILS) to DLMS Implementation Program Background Program Responsibilities Core Team Program Implementation Strategy Program Requirements Nomination Information Criteria for Nominated Projects Business Transformation Agency Review Process Jump Start Milestones Monthly Status Reports Metrics Funding Process MIPR Submission PDC Submission Related Background Information Risk Assessment DLMS Master Test Plan Program Correspondence Policy Directives and Related Documentation PMP Appendices Appendix A through H Defense Logistics Management System (DLMS) Migration Acceleration Program Management Plan (PMP) Version 3.0 Revised: May 11, 2008 Module 3 / DLMS Program Management Plan

  8. Ten Steps to Success • Jump Start Project Management Plan (PMP) (pg5) • http://www.dla.mil/j-6/dlmso/Programs/DLMS/jumpstart.asp • Assemble Team of functional and technical experts on the system to be migrated • Initiate early contact with DAASC/other trading partners (e.g., DFAS, MOCAS, WAWF); DAASC POC is Clarissa Elmore, (937) 656-3770 DSN 986-3770, email Clarissa.Elmore@dla.mil • Develop a Performance Based Agreement (PBA) with trading partners and Authority To Operate (ATO) • Acquire DAASC DLSS to DLMS X12 data maps for the transactions to be migrated • Establish communications mechanisms with DAASC and determine what addressing will be used with DAAS Module 3 / DLMS Program Management Plan

  9. Ten Steps to Success (con’t) • Schedule DLMS training with DLMSO and acquire training • Training courses can be requested by contacting DLMSO • Ellen Hilert 703-767-0676, DSN 427-0676, Ellen.Hilert@dla.mil • Select, acquire or develop an EDI or XML translator/parser • Develop phased migration plan/schedule • Pick a simple transaction first and do one at a time, reusing as much as possible for the next transaction • Use EDI or XML translation software and DAASC logical data maps to map/parse data for incoming/outgoing DLMS transactions to or from legacy database or flat files Module 3 / DLMS Program Management Plan

  10. Ten Steps to Success (con’t) • Establish table driven DLSS or DLMS on/off switching mechanism to establish positive control, allow for phasing and fail safe fall back • Test, Test, Test • Establish loop back testing arrangement with DAASC. System sends DLMS to DAASC & DAASC returns same document in DLSS format and/or vice versa for validation/verification. • Conduct unit code testing on each transaction (test all conditions) • Schedule and conduct integration testing with DAASC & Trading Partners as feasible • Schedule live cut over in increments, implementing few transactions at a time coordinating closely with DAASC Module 3 / DLMS Program Management Plan

  11. Legacy System Migration to DLMS Step #5, Phase I - Modify System to receive and send DLMS IMPACT ON TYPICAL SYSTEM - No Change to Database, applications logic, internal system messages; only the entry & exit programs must be modified. System transaction entry and exit program(s) System Application n1 System Application n2 DLMS Incoming transaction Database Or Flat Files Database DLMS Outgoing transaction System Application n3 System Application nn DLMS Trans No Change System transaction entry and exit program(s) Module 3 / DLMS Program Management Plan

  12. Legacy System Migration to DLMS Step #5, Phase II – Teach System to use new DLMS data IMPACT ON TYPICAL SYSTEM - Changes may be needed to database, application logic, and internal system messages System transaction entry and exit program(s) System Application n1 System Application n2 Incoming transaction Database Or Flat Files Database Outgoing transaction DLMS Trans System Application n3 System Application nn Potential Change System transaction entry and exit program(s) Module 3 / DLMS Program Management Plan

  13. Step #6. Pick a simple transaction first and do one at a time, reusing as much as possible for the next transaction. • Transactions within a DLSS family: • Same first two characters of the Document Identifier Code (DIC) • Data content nearly identical -- lots of reusability Module 3 / DLMS Program Management Plan

  14. Step #8. Establish table driven DLSS or DLMS on/off switching mechanism to establish positive control, allow for phasing and fail-safe fall backDLSS/DLMS Switching Table (used for DSS) Module 3 / DLMS Program Management Plan

  15. Logistics Data Resource Management System (LOGDRMS) Module 3 / Corporate Services

  16. Logistics Data Resource Management System (LOGDRMS) - Before • Individual localized implementations • Service Unique Solutions • Undisciplined, changing requirements • Manpower Intensive • Non Standard Processes • Non Standard Definitions • Multiple Contexts • Multiple Syntaxes • Limited Communication • Sneaker-Net and Swivel-Chair inputs • Questionable Content DOD Services(e.g., USA, USAF, USN, USMC, Federal) Application Developers(e.g., SAP, Oracle) Application & Interface Builders(e.g., IGC, IDE) Content Administrators(e.g., DLMSO, DTEB, DDCOI, Services) Data Analysts(e.g., DORRA, LOGSA) System Architects (e.g., DSS, Asset Visibility, EBS)

  17. Logistics Data Resource Management System (LOGDRMS) - Current • LOGDRMS Consists Of: • DLMS Data Element Dictionary/Directory • Directory of DLMS Supplements • Dictionary/Directory of DLMS Qualifiers [Reference (Code) Tables] • Summary of Contents: • 67 ANSI X12 Formatted DLMS Supplements • 213 ANSI X12 Data Elements • 865 DoD Enterprise Level (Core) Logistics Data Elements • 1900 DLMS Data Elements (Business Data Elements) • 197 DLMS Qualifiers (Reference (code) Tables) • Assorted Conversion Guides (Unit of Issue/Packing/Transportation) DOD Services(e.g., USA, USAF, USN, USMC, Federal) Application Developers(e.g., SAP, Oracle) Application & Interface Builders(e.g., IGC, IDE) Data Analysts(e.g., DORRA, LOGSA) System Architects (e.g., DSS, Asset Visibility, EBS) Content Administrators(e.g., DLMSO, DTEB, DDCOI, Services)

  18. DoD Corporate Services Module 3 / Corporate Services

  19. DoD Corporate Services • Fully operational EB infrastructure • Includes flexible and robust communications • Supports a transitional DLSS/DLMS environment • An efficient and effective organizational structure • DoD corporate sponsorship • Capable of overseeing implementation of commercial EDI • Sustains the DLMS infrastructure Module 3 / Corporate Services

  20. DLMSO Support to DLMS Implementers • Functional and technical consultation • Providing X12 implementation conventions and XML schemas • Arranging trading partner meetings/teleconferences • Testing assistance as required • Facilitate coordination with DAASC & trading partners • Modification & configuration management of DLMS • Business Rules • Transaction formats • Metadata • DLMSO Web site support • Providing DLMS Training materials and classes Module 3 / Corporate Services

  21. DLMSO Training Support DLMSO offers a two day DLMS training class. The class is composed of 9 modules containing 455 training slides used in conjunction with a number of class exercises and hand outs. Training covers how to implement DLMS, 10 steps to a successful implementation, available resources and lessons learned. Since March 2007, DLMSO has trained approximately 300 DoD Component personnel: Navy R-Supply Norfolk, VA March 27-28, 2007 Air Force ILS-S/SBSS Maxell-Gunter AFB, AL April 24-25, 2007 Army LOGSA & LAISO Huntsville, AL June 13-14, 2007 DAASC Dayton, OH July 24-25, 2007 Marine Corps MAISTER Albany, GA November 14-15, 2007 Navy ERP Annapolis, MD February 26 2008 DFAS Columbus, OH June 11-12, 2008 Air Force ECSS Dayton, OH July 17-18, 2008 The following DLMS training is in the planning phase: GSA Washington, DC April 28, 2009 GCSS-Army Petersburg, VA May 12-13, 2009 AF-ECSS (refresh) Dayton, OH TBD

  22. DLMSO Support to DLMS Implementations • DLMSO Management POCs: • Mr. DC Pipp (703) 767-0670/DSN 427-0670 donald.pipp@dla.mil • Major David Walker (703) 767-2611/DSN 427-2611 david.walker@dla.mil • DLMSO Functional Support POCs: • Ms. Ellen Hilert (703) 767-0676/DSN 427-0676 ellen.hilert@dla.mil • Ms. Mary Jane Johnson (703) 767-0677/DSN 427-0677 mary.jane.johnson@dla.mil • Mr. Bob Hammond (703) 767-767-2117/DSN 427-2117 robert.hammond@dla.mil • Ms. Heidi Daverede (703) 767-5111/DSN 427-5111 heidi.daverede@dla.mil • DLMSO Technical Transaction Support POCs: • Mr. Tommy Lyons (703) 767-1481/DSN 427-1481 thomas.lyons@dla.mil • Mr. Nat Obey (703) 767-2558/ DSN 427-2558 nathaniel.obey.ctr@dla.mil • Mr. Dale Yeakel (703) 767-8632/DSN 427-8632 dale.yeakel.ctr@dla.mil • Mr. Larry Tanner (614) 310-6059 larry.tanner.ctr@dla.mil • DLMSO Technical Metadata Support POCs: • Ms. Marva White (703) 767-6296/DSN 427-6296 marva.white@dla.mil • Mr. Joe Pipan (703) 767-0753/DSN 427-0753 joseph.pipan.ctr@dla.mil Module 3 / Corporate Services

  23. DAASC Support to DLMS Implementations • DAASC technical consultation and support for: • Set-up of new accounts, telecom protocols, and data protection schemes. • Logical data mappings between DLSS, DLMS, and XML • Coordination of integration testing with System PMO and trading partners • Control and maintenance of customer profiles and routing tables. • Coordination of integration testing with Service PM and trading partners. • Evaluation of test results and assistance with problem resolution. • Help Desk support for establishment of new trading partner connectivity, transaction tracking, trouble-shooting, and file recovery/resubmission. Module 3 / Corporate Services

  24. DAASC Support to DLMS Implementation • DAASC DLMS eBusiness Program Management POCs: • Clarissa Elmore (937) 656-3770/DSN 986-3770 Clarissa.Elmore@dla.mil • Jennifer Taulbee (937) 656-3400/DSN 986-3400 jennifer.taulbee@dla.mil • Functional Support POCs/DAASC Logistics Division: • Army/GSA: Pam Meredith (937) 656-3709/DSN 986-3709 pamela.s.meredith@dla.mil • Air Force/DLA: Mark Minch (937) 656-3741/DSN 986-3741 mark.minch@dla.mil • Navy/Coast Guard/USMC: Joanne Norman (937) 656-3742/DSN 986-3742 joanne.norman@dla.mil • DAASC Mapping Support POCs: • Doug Mummert (937) 431-8000 doug.mummert.ctr@dla.mil • Bill Strickler (937) 431-8000 william.strickler.ctr@dla.mil • DAASC eBusiness Group (account set-up): • Jordan Henderson (937)656-3804/DSN 986-3804 jordan.henderson.ctr@dla.mil • Andy Rohrer (937) 656-3805/DSN 986-3805 andrew.rohrer.ctr@dla.mil Module 3 / Corporate Services

  25. DLMS Operating Concept Module 3 / Operating Concept

  26. DLMS Operating Concept • To avoid the trauma and expense of "turn-key" implementations, an incremental migration to DLMS is in progress • DoD will operate in a mixed DLSS / DLMS environment for an undetermined period • During the transition period, logistics systems will undergo modernization and process reengineering changes Module 3 / Operating Concept

  27. Transition to DLMS • DLSS/DLMS conversion tables have been developed that allow conversion of data from DLSS to DLMS (ASC X12/XML) and vice-versa • These conversion tables enable logistics business to be conducted in both environments • DAAS will also translate between DLMS and: • Multiple versions of ASC X12 standards • Other emerging standards when adopted as DoD standards • Component User Defined File (UDF) formats (by exception) Module 3 / Operating Concept

  28. DLMS Operating Concept Conversion Operations Module 3 / Operating Concept

  29. Conversion Operations DAASC develops and performs configuration management of conversion maps DAASC uses a commercial “any-to-any” mapping software package that supports a robust conversion Components may use “at will” the format they possess – DLSS or DLMS – to initiate a transaction Module 3 / Operating Concept

  30. Conversion Operations • DAASC incorporates and maintains a profile of organizations and specifies whether they are operating in DLSS and/or DLMS • DLSS data elements are retained in the DLMS to support conversion • DLMS enhanced data may not be supported in legacy/transitioning systems - coordination with DLMSO required Module 3 / Operating Concept

  31. Conversion Policy • DoD Supply Chain Material Management Regulation (DoD 4140.1-R) states DAASC will be used for conversion services (see guidance beginning on page 162, Paragraphs C8.6.1.1.7, 8, 9, and 10). • The guidance to the Components to use DAASC is in Paragraphs C8.6.1.2.2.1 and C8.6.1.2.2.2. This guidance states all transactions are to be sent through DAASC and use the DAASC DLSS and DLMS standards conversion support capabilities. Module 3 / Operating Concept

  32. DLMS Operating Concept Translation Processing Module 3 / Operating Concept

  33. Translation Processing In the old DLSS environment, data is exchanged in a series of more than 450 fixed-length, 80-position record transactions To generate these transactions, Component logistics systems: Extract data from the appropriate module Format the record Pass it through DAAS The recipient then edits and formats it into the receiving application system Module 3 / Operating Concept

  34. Translation Processing … continued The EDI translator converts data to the DLMS format and sends it to DAAS The translator also performs a number of other functions, including maintaining: Telecommunications data Archiving messages Processing errors Module 3 / Operating Concept

  35. The following general rules apply: Transaction generation programs edit data to ensure it adheres to DLMS policy and data element standards, as well as ASC X12 syntax rules Translators group one or more of the same transaction sets into a single EDI group and envelope Initiating systems archive sent messages for no less than 90 days to ensure communication failures do not lead to loss of transmitted data Initiators create additional copies for recipients not identified in the transaction as an addressee or not previously specified in DAAS instructions Module 3 / Operating Concept

  36. Transaction Routing DAAS is the central hub for routing most DLMS transmissions; copies transactions and routes them to recipients according to DLMS procedures. Specialized routing is by agreement. Components and participating civil agencies can establish their primary routing link to the BTA GEX sites, which in turn forwards transactions to the DAAS GEX for logistics processing. Conversely, the DAAS GEX will forward acceptance report transactions to the BTA GEX which supports the mapping into the Wide Area Workflow – Receipt and Acceptance (WAWF-RA) processing system. Module 3 / Operating Concept

  37. Transaction Routing … continued Systems may connect directly or via commercial VANs Civil Agencies DoD Agencies GEX LOTS DAAS BTA Commercial VANs Connection to other DoD corporate databases DAAS can connect to commercial logistics trading partners either directly or through the trading partners’ Value Added Networks (VANs). Commercial organizations participating in DoD logistics Module 3 / Operating Concept

  38. Transaction Routing … continued • Archive transactions • Open messages and conduct standard or recipient-specific edits • Copy transactions in the DAAS Logistics On- Line Tracking System (LOTS) and route them to other DoD databases Central hub function includes capability to: Module 3 / Operating Concept

  39. Transaction Routing … continued Central hub capabilities … continued Group transactions that are bound for the same destination Forward newly grouped envelopes to recipients and archive outbound messages Forward messages outside the DoD telecommunications network to civil agencies, commercial Value-Added Networks (VANs), and trading partners Module 3 / Operating Concept

  40. Lessons Learned • Incorporate into your design an On/Off switch (table) for all outbound transactions down to the 3 character DIC – DAASC controls your inbound • Allows control over when and what is migrated • Allows transactions to be reversed if problems occur • Start work on the Performance Based Agreement (PBA) and Authority to Operated (ATO) immediately • Plan to exchange all transactions with all trading partners exclusively via DAASC (100%) • Begin discussions with DAASC pertaining to intentions, transmission protocol, design, and interface testing • Do NOT try to migrate too many transactions at one time! Module 3 / Lessons Learned

  41. Lessons Learned (con’t) • Request DAASC’s DLSS to DLMS translation maps • Scrutinize every piece of data within your DLSS transactions to ensure it is accommodated within the respective DS and DAASC map (may need to request change - PDC) • Design to incorporate DLMS processing into your actual application functionality to enable future expansion & data capabilities • Determine which new capabilities you want to incorporate into your applications • Design and develop your system and conduct thorough and extensive unit, system and interface testing with DAASC Module 3 / Lessons Learned

  42. Lessons Learned (con’t) • Do NOT rely solely upon documentation for data formats and validate the data in your MILS transactions • Large samples are best • They expose more transaction scenarios • Allow for a fuller view of possible data combinations that your system produces Module 3 / Lessons Learned

  43. Module 3 Quiz • Question 1: Which of the following is not one of the 10 steps to a successful DLMS implementation? • Assemble team e) Establish early relationship with DAASC • Schedule training f) Acquire translator/parser • Develop phased plan g) Cross fingers • Test, test, test h) DLSS/DLMS on/off switching table • Question 2:PRC processes proposed changes that might impact DLMS procedures and DLMS supplements to the federal Implementation Conventions. However, coordination outside the PRC membership is required when changes impact a broader area to include: • Federal or DOD policy d) All of the above • ASC X12 standards e) None of the above • Federal ICs • Question 3:Under the DLMS operating concept, DAASC can support data translation, • which of the following is not supported? • a) Component User Defined File (UDF) formats • b) English to Spanish • c) Multiple versions of the ASC X12 standards Module 3 / Quiz