An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. City of San DiegoMaking it Mandatory August 4, 2009 CRRA Presentation Stephen Grealy

  2. Overview • City Recycling Ordinance (CRO) for businesses, multi-family and single-family • Construction & Demolition (C&D) Ordinance • Environmentally Preferable Purchasing Program (EP3)

  3. Background • 1994 - Plan 2000 recommendations • 1999 - City Manager’s Committee on Waste Reduction • 1999 - Zero Based Management Review • 2005 - San Diego County Grand Jury Report • 2007 – Zero Waste, CAC, City Attorney • 2007 - Mayor’s Recycling Proposal/Ordinance

  4. CRO – Phasing • 1st Phase: • Existing City serviced customers – 1/1/08 • Residential served by Franchisees – 2/18/08 • Single family • Multi-family - 100 units or more • Commercial facilities ≥ 20,000 sf – 2/18/08 • Mixed use facilities fitting either threshold in previous two bullets (above) • Special events – 2/18/08

  5. CRO – Phasing • 2nd Phase: January 1, 2009 • Multi-family - 50 units or more • Commercial facilities - 10,000 sf or more • Mixed use facilities fitting either threshold in previous two bullets (above) • 3rd Phase: January 1, 2010 • All multi-family • All commercial facilities • All mixed use facilities

  6. CRO – Reporting • Reports • Due August 15th for previous FY • Certified Recyclable Materials Collectors • Voluntary • Listed on ESD website & outreach materials • $130 application fee (cost recovery) • Renewal every 2 years

  7. CRO – Exemptions • 6 cubic yards or less • Temporary exemptions – one year • Discretion of Mayor/designee • Lack of space • Lack of available markets • Alternative recycling efforts • Amount and type of solid waste or recyclable waste generated • $130 exemption application (cost recovery fee)

  8. CRO – Education • Emphasis on education – 45,000 Bags • ESD to provide • On site technical assistance • Downloadable templates for education materials • Service provider lists • Shared responsibility • Educational material/signage • Industry partnerships • Hauler/certified recycler role

  9. CRO – Responsibilities & Enforcement • Owner/manager/landlord • On site recycling services • Educational materials annually & to new tenants • Inform tenants if any changes in recycling services • Occupants • Participate in program • Separate recyclables from trash • Enforcement guidelines - based on established protocols • 170 enforcement site visits to date

  10. CRO – Enforcement Focus on achieving compliance through education and technical assistance • Fines assessed in cases where education / assistance have been offered and violator continues to fail to meet requirements Failure to provide recycling service at residential, commercial, and mixed use facilities • Procedure: Code Enforcement Officers will conduct inspections based primarily on complaints and reports provided to City • 1st, 2nd, and 3rd violation: Issue notice to responsible person advising of recycling requirements, the availability of technical assistance, and provide ESD contact information. • Fourth Inspection: Issue $100 Administrative Citation, advise responsible person of the availability of technical assistance, and provide ESD contact information. • Fifth and any Subsequent Inspections: Issue next level Administrative Citation ($250, $500, $750 or $1,000 depending on magnitude of violation), advise responsible person of the availability of technical assistance, and provide ESD contact information. • If no compliance after issuance of a $1,000 Administrative Citation, refer case to City Attorney's Office.

  11. Minimum Recycling Guidelines Exceptions approved on a case by case basis by the Environmental Services Director or designee.

  12. CRO – Website

  13. C&D Ordinance Background • C&D Ordinance adopted Oct. 10, 2005, not implemented • C&D Ordinance amendments adopted Dec. 4, 2007 • Became effective July 1, 2008 • Creates a financial incentive to recycle through collection of refundable deposits • Deposits collected on building, combination and demolition/removal permits • Exemptions for projects not likely to produce much C&D debris

  14. Permits Subject to C&D Ordinance * Projects under the minimum square footage are exempt from the C&D debris recycling deposit.

  15. C&D Ordinance Exemptions Other Exemptions Besides Minimum Sq. Ft. Include: • Roofing projects that do not include the tear-off of the existing roof. • Installation, replacement or repair of: • Retaining wall • Carport • Balcony • Trellis • Fireplace • Deck • Projects which require only an electric, plumbing or mechanical permit. • Projects which are expected to generate only hazardous waste and/or hazardous substances. • Projects for which the construction and demolition debris deposit is less than $200. • Fence • Swimming pool or a spa • Storage racks • Pre-fabricated sign which does not require modification to the structure to which sign is attached

  16. C&D Ordinance (cont.) • City certifies C&D recyclers, verifying diversion rate and permit status • To obtain refund in part or in full the applicants must document the following: • Debris is recycled with certified facilities • Onsite reuse of C&D debris • Other: Donations or reuse of debris

  17. Before the Project Starts • Plan for recycling • Identify types and quantities of debris to be generated • Identify opportunities for on-site and/or off-site reuse • Determine how to manage (i.e. source separated vs. mixed C&D recycling) • Incorporate into contracts including subs

  18. Application Process • Permit Submittal – pick up Waste Management Form (WMF) • Complete WMF and make copy • Permit Issuance – return completed WMF and pay refundable recycling deposit

  19. During the project • Ensure that at least 50% of all of the project's debris is recycled or reused on-site or off-site. • Save ALL recycling, reuse and disposal receipts from project related debris. • Document reuse activities – photos and receipts or written documentation

  20. At the end of the Project • The permit applicant must submit the following within 180 days of passing final inspection: •  A properly completed Waste Management Form - Part II (WMF II) • A copy of the completed WMF I, if not already submitted with WMF II. • Evidence, including all recycling, reuse and disposal receipts, photographs and other documentation, which clearly demonstrates that the C&D debris generated by the project was recycled at the applicable recycling rate.

  21. Tips for completing WMF – Part II

  22. C&D Website

  23. Environmentally Preferable Purchasing Program (EP3) • Council Policies • 1989 (rev. 1992) – Recycled Products Procurement • 1997 (rev. 2001 & 2003) – Sustainable Building • 2001 – Purchase of Energy Efficient Products • ESD Pilot Project FY05 • EP3 Administrative Regulation 35.80 – April 2007 • Park and Rec Pilot

  24. Alternative Energy Source Bio-based Biodegradable Compostable High Recycled Content Low Toxicity Low Volatile Organic Compounds (VOC) Pollution Reduction Recyclable Repairable Resource Efficient Reusable EP3 Criteria • Established twelve environmentally preferable categories to aid decision-making

  25. Strategies • Department by department or commodity by commodity? • Identifying commodities • Opportunistic • Synergistic • Bottom line

  26. Citywide FY08 EP3 Purchases • City purchased over $42 million of EP products and services • Computers, printers, copiers, office products, & paper: $5.6M • Vehicles & vehicle maintenance: $1M • Building & construction materials: $28.6M • Building supplies, maintenance, energy efficiency: $4.1M • Other: $2.8M

  27. Examples of FY08 EP³ Cost Savings and Revenues • $2.9M in savings by using reclaimed water • $8.8M in reduced energy consumption and costs through energy retrofits, solar panels, co-gen, and hydro power at City facilities • $908,000 in renewable energy sales revenue • $221,000 by using recapped tires on certain vehicles • $65,000 by recycling old trash and recycling containers

  28. FY09 Goals • Increase hybrid vehicles • Rubberized asphalt concrete • EPEAT computer purchases • Bottled water ban • Duplex printing/copying • Park and Recreation Zone Recycling Revenue Expenditures • Cold patch asphalt made from roofing shingles

  29. Pilot Projects • Organic fertilizer in Park & Rec • Fuel additive • Plastic manholes Conventional Organic Photo courtesy of California Organic Fertilizers, Inc. Photo courtesy of Underground Technologies, LLC.

  30. Pilot Projects (cont.) • Green Cleaners • Asphalt shingle grindings in roads • Goats for brush management Goats clearing brush in Carmel Valley Asphalt shingle grindings

  31. Contact Information C&D Ordinance: Martha Espinola 858-573-1242 Ken Prue 858-492-5085 EP3: Donna Chralowicz 858-492-5059 Megan Grodeon 858-492-5009 City Recycling Ordinance: Donna Chralowicz 858-492-5059 Megan Grodeon 858-492-5009 Ana Carvalho 858-573-1243 Other questions/issues: Stephen Grealy 858-573-1275