110 likes | 230 Views
ITRP the building of Collaboration. March 2009 Networks for 21st Century Learning. The California State University. Biggest higher education system in the US 23 campuses and the chancellor office ~450K Students ~45K faculty and staff. History of the Infrastructure Terminal Resource Project.
E N D
ITRP the building of Collaboration March 2009 Networks for 21st Century Learning
The California State University • Biggest higher education system in the US • 23 campuses and the chancellor office • ~450K Students • ~45K faculty and staff
History of the Infrastructure Terminal Resource Project • Phase 1 –Telecommunication Infrastructure Initiative (TII) the bricks and mortar. • Phase 2 Infrastructure Terminal Resource Project (ITRP) the blinking lights, refresh, NMS and training.
After TII ~300 Million
Section Header ITRP 1 • Integrator selected (remember Pac Bell, SBC and now AT&T) • Recommended Cisco for Switching and Routing • The NTA was formed • The birth of collaboration
I will make the decision if you do not come to consensus. (M. Crase) • 23 directors (one from each campuses) of Networking and Telecommunication formed the Network and Technology Alliance (NTA) • “Encouraged” to make recommendation
First working group formed • Network Management System – The first bake off • Strategic engineering (SE) working group • 2005-6 restructured to get aligned with ITIL
The next generation of WG • ITRP 2 steering group • The bake off • Security • Wireless • NMS
Security • Design • Best practices • Deployment