1 / 6

2013 WTBA WisDOT Contractor Engineer Conference George Poirier P.E . FHWA – Wisconsin Division

2013 WTBA WisDOT Contractor Engineer Conference George Poirier P.E . FHWA – Wisconsin Division. FHWA Update. Construction Industry Acknowledgments Sustainable Transportation Funding?. FHWA Update. Construction Emphasis Areas for 2013 Change Orders Staffing - Responsible Charge

Download Presentation

2013 WTBA WisDOT Contractor Engineer Conference George Poirier P.E . FHWA – Wisconsin Division

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2013 WTBA WisDOTContractor EngineerConferenceGeorge Poirier P.E.FHWA – Wisconsin Division

  2. FHWA Update • Construction Industry Acknowledgments • Sustainable Transportation Funding?

  3. FHWA Update • Construction Emphasis Areas for 2013 • Change Orders • Staffing - Responsible Charge • Non-Conforming Materials • Buy America • Verification Testing • Cold Weather Asphalt Paving

  4. Thank You • John Horsley and the entire leadership of AASHTO • AGC of America and ARTBA (American Road and Transportation Builders Association) • NACE, (National Association of County Engineers) APWA, (American Public Works Association) LTAPs and TTAPs, ACEC (American Council of Engineering Companies) • Resource Agency Partners http://www.fhwa.dot.gov/everydaycounts

  5. How long does it take to deploy innovation in the transportation industry? • Change a business practice • Replace a design system • Replace a construction process… 2 years? 10 years? 5 years? 20+ Years?