XRT Team Meeting
XRT Team Meeting. Location: ISAC/ASDC September 17-18, 2003. PSU CALDB file status. CALDB items stored in Excel file Converted to FITS format under Linux/Solaris Managed with SCCS Sent via FTP to ISAC Bad Pixel Table Currently we have one hot pixel: (DETX, DETY) = (454, 391)
143 views • 3 slides