1 / 2

ARA Weekly Status (June 7-13) Jiwoo Nam

ARA Weekly Status (June 7-13) Jiwoo Nam. NTU-UH DAQ-Box Design Meeting (June 8) comments from Brendan Fox  design modified ( Shihao & Chuan Jui ) NTU-UW Production Meeting (June 13) H- pol antenna design finalized Some DAQ-box enclosure design issues

limei
Download Presentation

ARA Weekly Status (June 7-13) Jiwoo Nam

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARA Weekly Status (June 7-13)Jiwoo Nam • NTU-UH DAQ-Box Design Meeting (June 8) comments from Brendan Fox  design modified (Shihao & Chuan Jui) • NTU-UW Production Meeting (June 13) H-pol antenna design finalized Some DAQ-box enclosure design issues Antenna Production Plan (by Jim)

  2. Subgroup Reports Surface Team DAQ-box design DAQ-stacks (PCB + part purchasing) PO (internal cables etc) DownholeTeam LNA Module Production V-pol Antenna Production H-pol materials (Ferrite etc) PO and Endcap production Cables Quotations and PO

More Related