ARA Weekly Status (June 7-13) Jiwoo Nam. NTU-UH DAQ-Box Design Meeting (June 8) comments from Brendan Fox design modified ( Shihao & Chuan Jui ) NTU-UW Production Meeting (June 13) H- pol antenna design finalized Some DAQ-box enclosure design issues
E N D
ARA Weekly Status (June 7-13)Jiwoo Nam • NTU-UH DAQ-Box Design Meeting (June 8) comments from Brendan Fox design modified (Shihao & Chuan Jui) • NTU-UW Production Meeting (June 13) H-pol antenna design finalized Some DAQ-box enclosure design issues Antenna Production Plan (by Jim)
Subgroup Reports Surface Team DAQ-box design DAQ-stacks (PCB + part purchasing) PO (internal cables etc) DownholeTeam LNA Module Production V-pol Antenna Production H-pol materials (Ferrite etc) PO and Endcap production Cables Quotations and PO