Jelsa Project. 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides. 25.06.2009. Material flow from PPP to SPP – mostly direct feed. Secondary plant – Building Ensemble. Tertiary plant feed stock – Total 250.000 tons for 5 process days.